TY - BOOK AU - Rosales,Edmar Esmero AU - Chauhan,Roshan Lal AU - Ping Kunawatsatit, AU - Pichai Nimityongskul, AU - Jearkjirm,Vithool ED - The Danish International Development Agency Denmark, TI - Construction planning of a large project T2 - Thesis PY - 1988/// CY - Bangkok PB - Asian Institute of Technology KW - Construction industry KW - Planning N1 - A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology; Thesis (M.Eng.) - Asian Institute of Technology, 1988 N2 - This study attempted to apply the concepts of construction planning to a large civil engineering project consisting of three earth dams . Various activities to be executed were identified, construction methods were suggested, the durations of various activities were estimate d, and construction sequences were proposed for maximum productivity at minimum cost . A d e tailed discussion of major work items were presented and a CPM (Critical Path Method) network mod e l was us e d to portray the proposed construction plan . The reliability of the plan was then tested through comparison with actual field situation UR - http://203.159.5.9/ait-thesis/detail.php?q=B18658 ER -