<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Consultants' project management system to manage contractors</title>
    <subTitle>a case study of a factory project</subTitle>
  </titleInfo>
  <name type="personal">
    <namePart>Nyi Nyi Win Htut</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Hadikusumo, Bonaventura H. W.</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Chotchai Charoenngam</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Wasan Teerajetgul</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <genre authority="marc">series</genre>
  <genre authority="marc">theses</genre>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Pathum Thani, Thailand</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>2021</dateIssued>
    <issuance>continuing</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>100 leaves : ill. + 1 online resource</extent>
  </physicalDescription>
  <abstract>A project is a combination of complex activities under the definite starting point and  end point. It unites with many organization of owner, designer, consultant and  contractor depend on bidding type. Project management manages to achieve the  objectives and satisfaction of the client by providing service to manage the cost,  quality and time with the approved design and specification adding with the safety  and environmental aspects. Thus, consultant{u2019}s project management system is a vital  role of the construction phase.  This report is shown for the practice of consultant project management with the case study. It is shown how consultant team manage to contractor in each item of design  management during construction phase, schedule, cost, quality and health, safety and  environmental in startup, during and end of construction. From the practice, this  report analyzes the strengths, weakness and recommendation in each management.  From the analysis, a framework develops by adding the existing system to be more  efficient for consultant{u2019}s project management.  Nowadays, it had seen many accidents or failures in constructions especially in  developing countries under lack of supervision, quality and design. This report might  help some parts to develop or share knowledge the project management in  construction. </abstract>
  <note>A project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management</note>
  <note>Project (M. Eng.) - Asian Institute of Technology, 2021</note>
  <subject authority="lcsh">
    <topic>Project management</topic>
    <geographic>Myanmar</geographic>
    <topic>Case studies</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Construction projects</topic>
    <geographic>Myanmar</geographic>
    <topic>Case studies</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Project ; no. MPM-MM-CM-21-22</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B23858</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B23858</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">260324</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818084937.0</recordChangeDate>
  </recordInfo>
</mods>
