<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Contractor's algorithms through CPM networks for optimal financial policies</title>
  </titleInfo>
  <name type="personal">
    <namePart>Yang, Ming-kai</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Pichai Nimityongskul</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Jearkjirm, Vithool</namePart>
    <role>
      <roleTerm type="text">Co-Chairpeson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Ping Kunawatsatit</namePart>
    <role>
      <roleTerm type="text">Examiantion Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Chauhan, Gopal</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>German Academic Exchange Service (DAAD)</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1986</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>47, A-37 p.</extent>
  </physicalDescription>
  <abstract>In a CPM network of a construction project, some non critical  activities normally exist and they can be shifted in such a way that the  project can be more properly and economically executed by the contractor  for a specific reason .  This technique h as been developed a nd is termed as the well-known  resource levelling by shifting the noncritical activities which also  gives the contractor a chance to have a minimum financial cost or a  minimum amount of fund tied up for a project. With this concept, the  contractor may have better financial policies suitable algorithms have  been developed in this study. Computer program has also been developed to  avoid tedious manual computations and the study has been illustrated  through examples.</abstract>
  <note>A thesis study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 1986</note>
  <subject authority="lcsh">
    <topic>Critical path analysis</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Construction industry</topic>
    <topic>Planning</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. ST-86-32</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B19772</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B19772</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">310798</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818085039.0</recordChangeDate>
  </recordInfo>
</mods>
