<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Contractual conditions and major delays in a thermal power plant construction project</title>
    <subTitle>a case study of Vietnam</subTitle>
  </titleInfo>
  <name type="personal">
    <namePart>Nguyen Thi Huyen Trang</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Hadikusumo, Bonaventura H. W.</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Chotchai Charoenngam</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Santi Charoenpornpattana</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>Vietnam Electricity (EVN)</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <genre authority="marc">series</genre>
  <genre authority="marc">theses</genre>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Pathum Thani, Thailand</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>2018</dateIssued>
    <issuance>continuing</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <extent>65 leaves : ill.</extent>
  </physicalDescription>
  <abstract>Rapid economic development in Vietnam in recent years has led to the increase in power  demand. With a variety of energy sources such as coal, gas, oil etc., the power sector's  structure of Vietnam has shifted from hydropower to thermal power. However, the delay of  construction of thermal power plant has become a concerning problem to ensure energy  security and stability for the country's economic development. Based on literature review  from books, journal articles and other sources, construction delay is caused by many  factors such as owner- related, contractor- related, consultant- related and external- related  factors.  As a result, this research is conducted to study one particular case of delay in thermal  power plant project to identify root causes of delay during construction stage in  comparison with theory, especially delays related with contract conditions and  administration. Ten major delay problems of this case are analyzed carefully based on  actual activities on site and related contractual conditions. Associated contract  management of the owner and subsequent solutions to mitigate the problem are discussed  in detail as well.  From all the analysis, specific recommendations are given to each delay event to help  owner avoid or minimize the effect of similar problem in the future. Moreover, general  lessons learnt from the study case are given on how to select competent contractors,  prepare good contract document and improve management skill of owner's management  board to carry out future projects successfully on time.  </abstract>
  <note>A project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction, Engineering and Infrastructure Management</note>
  <note>Project (M. Eng.) - Asian Institute of Technology, 2018</note>
  <subject authority="lcsh">
    <topic>Electric power-plants</topic>
    <topic>Construction</topic>
    <geographic>Vietnam</geographic>
  </subject>
  <subject authority="lcsh">
    <topic>Construction contracts</topic>
    <geographic>Vietnam</geographic>
    <topic>Case studies</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Project ; no. MPM-CM-18-20</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <recordInfo>
    <recordCreationDate encoding="marc">200723</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818085043.0</recordChangeDate>
  </recordInfo>
</mods>
