<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Cost control systems in the construction industry</title>
  </titleInfo>
  <name type="personal">
    <namePart>Aspiras, Felix Fernandez</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Scott, David</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Jearkjirm, Vithool</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Pama, Ricardo P.</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>Government of the Federal Republic of  Germany</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1978</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>68 p.</extent>
  </physicalDescription>
  <abstract>This study has been made to develop a simple but adequate cost control model which is presented in such a way as to help the small contractor and  the manager establish a cost control system in their own construction companies. The existing concepts of cost control and the systems used by  different writers are reviewed. An attempt is made to evaluate cost control in current practice by making inquiries to sever al construction firms. A general application of the model is presented. This will serve  as an outline of the system and is applicable to a variety of projects. The model is applied to a specific project which is being constructed by a company without a cost control system.</abstract>
  <note>A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand.</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 1978</note>
  <subject authority="lcsh">
    <topic>Construction industry</topic>
    <topic>Costs</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. 1318</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B22913</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B22913</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">250398</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818085310.0</recordChangeDate>
  </recordInfo>
</mods>
