    <title>Decision models for earthmoving techniques</title>
  </titleInfo>
  <name type="personal">
    <namePart>Pradhan, Niranjan Man</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Techapun Raengkhum</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Kirby, E.S.</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Sharif, M. N.</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>Government of Canada</namePart>
    <role>
      <roleTerm type="text">Scholasrhip Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1976</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>125 p.</extent>
  </physicalDescription>
  <abstract>This research study is concerned with the earthmoving  operation and earthmoving techniques in construction as general. The aim of this study is to provide decision makers of the developing countries with a set of methodological tools to assess the productivity and cost of earthmoving equipments and labour, and to determine the optimum combination of earthmoving resources in any conditions. Mathematical Models are formulated to compute t he productivity and cost of equipments and labour in different circumstances along with hypothetical examples and discussions on the parameters which influence the above factors. With the discussions of appropriate technology for developing countries in earthmoving operation, a  Linear Programming Model is formulated to find the optimum combination of earthmoving resources. Examples are also given to illustrate t he Model along with a sensitivity analysis. To satisfy the multiple objectives in earthmoving operations, a Goal Programming Model is formulated with some examples. And at the end Recommendations  for future work are suggested.</abstract>
  <note>A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 1976</note>
  <subject authority="lcsh">
    <topic>Earthmoving machinery</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Decision-making</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. 1167</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B23944</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B23944</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">240398</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818085848.0</recordChangeDate>
  </recordInfo>
</mods>