TY - BOOK AU - Akhtar,Mohammad Saeed AU - Techapun Raengkhum, AU - Pakorn Adulbhan, AU - Sharif,M.N. ED - The Government of New Zealand, TI - The economic design of control charts incorporating the effect of operator fatigue T2 - Thesis PY - 1977/// CY - Bangkok PB - Asian Institute of Technology KW - Quality control KW - Industrial management N1 - A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand; Thesis (M.Eng.) - Asian Institute of Technology, 1977 N2 - This study investigates the relationship between operator fatigue and quality deterioration. Based on t he data collected from a selected factory, it is found that a straight line is the best fit for the relationship. The finding is incorporated in the design of economic quality control chart models for a mass production man-machine process. As a matter of fact, the process may go out of control because of the machine errors or the human errors due to fatigue. If it is a machine error, t he machine can be readjusted. The human fatigue continuously increases the risk of false indication by the control chart. Model s formulated in this study are based on a trade off between the two types of risks involved: (a) indication of a shift in the process when non has taken place and (b) failure to indicate a shift when one has really occurred. Models are developed for attributes and variables control charts to minimize the total cost given by a set of optimal parameters the sample size; the multiple of standard deviation which determines the spread of control limits; and the sampling frequency. Data from a factory has been used to test the applicability of the models UR - http://203.159.5.9/ait-thesis/detail.php?q=B23225 ER -