<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Effect of escalation on project costs</title>
  </titleInfo>
  <name type="personal">
    <namePart>Yang, Yuan-pei</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Karasudhi, Pisidhi</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Ping Kunawatsatit</namePart>
    <role>
      <roleTerm type="text">Co-Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Varma, Mahesh</namePart>
    <role>
      <roleTerm type="text">Examiantion Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>The Government of Republic of China</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1982</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>v, 65 p.</extent>
  </physicalDescription>
  <abstract>This research deals with the effect of price escalation on project costs. Escalation clauses from seven different sources were reviewed and an escalation model, based on the detailed approach, suitable for  building projects is proposed. Cost breakdown for thirteen building projects built in the Bangkok vicinity classified into four building categories were analyzed to summarize the cost coefficients for use in the proposed escalation model.  For forecasting the future cost trends, the price indices for  labor, equipment and various materials were established and regression analysis was done. The study was also extended to calculate the new cost and capital needed due to escalation. Finally, two examples were used to demonstrate the application of the findings.</abstract>
  <note>A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering School of Engineering and Technology</note>
  <note>Thesis (M.Eng.)- Asian Institute of Technology, 1982</note>
  <subject authority="lcsh">
    <topic>Construction industry</topic>
    <topic>Costs</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. ST-82-27</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B21362</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B21362</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">050898</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818094932.0</recordChangeDate>
  </recordInfo>
</mods>
