<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Effect of price escalation on highway construction projects</title>
  </titleInfo>
  <name type="personal">
    <namePart>Walawage, Ranjith Palitha Ahangama</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Karasudhi, Pisidhi</namePart>
    <role>
      <roleTerm type="text">Chairpeson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Ping Kunawatsatit</namePart>
    <role>
      <roleTerm type="text">Co-Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart> Wireland, Martin</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1983</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>iv, 73 p.</extent>
  </physicalDescription>
  <abstract>This study is to emphasize the financial problems caused by escalation of prices in highway construction projects. Through the review of the current trends of escalation and the existing escalation models, a more reliable model is developed to estimate the amount of escalation. The statistics of five highway and one expressway construction projects are used to develop the new model. Past prices of major resource items are used to obtain the prediction curves by polynomial regression analysis, which may be useful to forecast future costs in fixed price contracts. Results by the new model are compared with those by the two models used in the Department of Highways of Thailand. Effects of the  price escalation on cash flows and working capital of projects are investigated, and procedures for cost adjustments as project are presented. Finally, the influence of inflation on the depreciation allowance and the resulting losses are examined. </abstract>
  <note>A thesis submitted in partial fulfillment of the requirement for the degree of Master of Engineering, School of Engineering and Technology</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 1983</note>
  <subject authority="lcsh">
    <topic>Road construction</topic>
    <topic>Cost effectiveness</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. ST-83-21</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B21010</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B21010</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">040898</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818095034.0</recordChangeDate>
  </recordInfo>
</mods>
