<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Feasibility study of economic analysis</title>
    <subTitle>the case of interconnection lines between Cambodia and Thailand</subTitle>
  </titleInfo>
  <name type="personal">
    <namePart>Loeung Keosela</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Surapong Chiraratananon</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Yu, Cun Yi</namePart>
    <role>
      <roleTerm type="text">Co-Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Dhadbanjan, Thukaram</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Rajapakse,Athula</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>Swedish International Development Cooperation Agency (Sida)</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <genre authority="marc">series</genre>
  <genre authority="marc">technical report</genre>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>2000</dateIssued>
    <issuance>continuing</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <extent>146 leaves</extent>
  </physicalDescription>
  <abstract>At present, the electric power supply in Cambodia is a problem because of the high price of energy and the lack of power stations, hydroelectric and thermal power plants of sufficient capacity to respond to rapidly increasing demand. In addition, Cambodia has no transmission lines connected between the regions. Among these, Bantey Mean Chey, Siem Reap and Battambang provinces are three of the more important provinces, where economic activity is developing swiftly. However, in order to address the shortage of power supply, the new resource of power supply is the first priority to be considered by connecting transmission line from the neighbor countries. This transmission line must be capable satisfying demand in the local area and transferring excess supply to other regions throughout the country by an interconnection system</abstract>
  <note>A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology</note>
  <subject authority="lcsh">
    <topic>Interconnected electric utility systems</topic>
    <topic>Cambodia</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Interconnected electric utility systems</topic>
    <topic>Thailand</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. ET-00-4</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B06786</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B06786</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">280101</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818113539.0</recordChangeDate>
  </recordInfo>
</mods>
