<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Analyzing the logistic process for pre-engineering building (P.E.B) construction</title>
  </titleInfo>
  <name type="personal">
    <namePart>Le Khac Bao</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Chotchai Charoenngam</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Hadikusumo, Bonaventura H. W.</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Huynh, Trung Luong</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <genre authority="marc">series</genre>
  <genre authority="marc">technical report</genre>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Pathum Thani, Thailand</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>2009</dateIssued>
    <issuance>continuing</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <extent>51 leaves : ill.</extent>
  </physicalDescription>
  <abstract>Erection is the last important stage of P.E.B product life cycle, to complete success this stage,  it  is  requested  the  fulfillment  of  previous  stages  as  the  erection  logistic  stage.  However,  in  the  real  erection  job  sites,  especially  the  job  sites  in  Vietnam,  there  a  lot  of  problems  happened  in  this  stage  that  make  erection  stage  can  not  be  completed  as  expected, by analyzing to find out the root causes of these problems from the data, which are  investigated  from  a  real  P.E.B  company,  base  on  key  relevant  theories,  the  Author  would like to develop the solutions for future improvements. </abstract>
  <note>A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Construction Engineering and Infrastructure Management</note>
  <note>Project (M. Eng.) - Asian Institute of Technology, 2009</note>
  <subject authority="lcsh">
    <topic>Construction industry</topic>
    <geographic>Vietnam</geographic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Project ; no. CM-09-12</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B00924</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B00924</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">101102</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260817162550.0</recordChangeDate>
  </recordInfo>
</mods>
