    <title>integrated project management control system</title>
  </titleInfo>
  <name type="personal">
    <namePart>Yuh, Cherng</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Pichai Nimityongskul</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Ping Kunawatsatit</namePart>
    <role>
      <roleTerm type="text">Co-Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Carmichael, D.G.</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>Republic of China (RSEA)</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1985</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>179 p.</extent>
  </physicalDescription>
  <abstract>In this study, the construction management tasks of project planning, scheduling, and controlling are discussed. A BASIC Micro-Computer program group for project schedule and control is also developed. Attention is concentrated on the project control system, based upon the Critical Path Method (activity of arrow) as the research topic. Data and relevant information of a building construction project were collected. The proposed integrated project management program is tested, and proves to be  a very useful method for project management. </abstract>
  <note>A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 1985</note>
  <subject authority="lcsh">
    <topic>Electronic data processing</topic>
    <topic>Construction industry</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Construction industry</topic>
    <topic>Management</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. ST-85-33</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B20126</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B20126</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">040898</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818143528.0</recordChangeDate>
  </recordInfo>
</mods>