<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <nonSort>An </nonSort>
    <title>application of a microcomputer to construction</title>
  </titleInfo>
  <name type="personal">
    <namePart>Suthep Chaithanagulmongkol</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Worsak Kanok-Nukulchai</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Jearkjirm, Vithool</namePart>
    <role>
      <roleTerm type="text">Co-Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Karasudhi, Pisidhi</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>Australian Government</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1980</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <extent>116 p.</extent>
  </physicalDescription>
  <abstract>Aid of a microcomputer to a construction project manager for project planning and scheduling is investigated. A microcomputer system model of project scheduling and updating is developed. The model consists of many modular programs which are used for network computation, resource  requirement scheduling, cash flow analysis, and purchasing scheduling. A sample project is illustrated to show input and output of the model. A  comparison of results of the sample project scheduling and updating by a microcomputer with those by a manual procedure is made, and shows that project scheduling and updating by a microcomputer is quicker, easier, and  more economical.</abstract>
  <note>A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 1980</note>
  <subject authority="lcsh">
    <topic>Microcomputers</topic>
    <topic>Programming</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Construction industry</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. ST-80-21</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B22141</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B22141</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">140301</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260817162826.0</recordChangeDate>
  </recordInfo>
</mods>
