TY - SER AU - Charoen Kriengkrairut AU - Vrat,Prem AU - Oudheusden,Dirk L.van AU - Tabucanon,Mario T. ED - Government of Australia, TI - Application of goal programming for project crashing T2 - Research studies project report PY - 1985/// CY - Bangkok PB - Asian Institute of Technology KW - Industrial project management KW - Critical path analysis N1 - A research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology; Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1985 N2 - This study presents a goal programming mod el for project crashing problem. A convex type nonlinear time -cost relationship is considered and approximated by piecewise linear relationship, each segment reflecting a surrogate activity . The goal programming mod el with piecewise linear segments is developed. The model considers four goals concerning both time and cost . These are < 1> meeting a new specified completion period, ( 2 ) ensuring that certain activities are not crashed for quality reasons, (3) confining the expenses to a specified budget, and (4) minimizing the total direct cost of crashing. The goal programming model with two piecewise linear segments is formulated and applied to a real - life project which is currently in progress. Th e model is solve d using Sequential Linear Goal Programming (SLGP) algorithm implemented via MPSX package. Optimal project crashing policy for the project is evolved . An extensive sensitivity analysis of the project crashing problem is reported to examine the effect of change d priority structure of project goals, and change s in unit cost of crashing. Effect of increasing the precision by introducing more number of segments on the optimal crashing schedule is examined using a hypothetical example UR - http://203.159.5.9/ait-thesis/detail.php?q=B19882 ER -