<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Application of material requirements planning in a workshop of construction company</title>
  </titleInfo>
  <name type="personal">
    <namePart>Lee, Hsien</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Lu, Iuan-Yuan</namePart>
    <role>
      <roleTerm type="text">Chairpeson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Vrat, Prem</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Fujiwara, Okitsugu</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Saeed, Khalid</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>Government of the Republic of China</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <genre authority="marc">series</genre>
  <genre authority="marc">technical report</genre>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1985</dateIssued>
    <issuance>continuing</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <extent>42, I-1 p.</extent>
  </physicalDescription>
  <abstract>The material requirements planning system is used extensively with planned production. It is suitable for items which have a derived demand. For items that are materials or components used for end items, stock levels are derived from the requirements  dictated by end item. It is a derived order quantity system.  A workshop of construction company is responsible to maintain the regular operation of the equipment . The preventive maintenance  of equipment required amount of various parts. The shortage of  parts caused the shutdown of the equipment, excessive inventory incurred more carrying cost. So the MRP system was considered to solve the problem.  The study deals with the adaption and implementation of the MRP model to the maintenance job of the workshop . Data from the part requirements of 5 models of equipment, each with 4 types of maintenance were analyzed. A new lot sizing technique was developed for more efficient to saving the computation. The results indicated that the MRP approach could help in solving the problems.</abstract>
  <note>A research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology</note>
  <note>Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1985</note>
  <subject authority="lcsh">
    <topic>Materials management</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Research studies project report ; no. IE-85-10</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B19883</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B19883</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">121095</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260817162917.0</recordChangeDate>
  </recordInfo>
</mods>
