    <title>Application of quantitative models for construction planning of the Kra-Canal navigation project in Thailand</title>
  </titleInfo>
  <name type="personal">
    <namePart>Saha, Swapan Kumar</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Chauhan, Roshan Lal</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Jearkjirm, Vithool</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Ping Kunawatsatit</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>Government of Norway (NORAD)</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1989</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>128 p.</extent>
  </physicalDescription>
  <abstract>Several applications of quantitative models are studied in  the present research, starting with the estimation of excavation  quantities and identifying and locating disposal sites. The  quantities have been estimated from the cross sections of canal  excavation taken at 1 km interval along the route adopted by TAMS  in their 1973 study. Three disposal sites for ex cavated material  have been identified along the route and their capacities  estimated from the areas available at each site and considering a  dumped hight of 50 m.  Quantitative models have been used for the construction  planning of equipment for drilling, muck loading and hauling.  Application of queuing model resulted in selecting and matching  appropriate loading and hauling equipment yielding minimum unit  cost. This study also included the analysis showing how the  number of servers influences the unit cost for different haul  distances. The results of the analysis show that for the range of  haul distances 0 to 3 km , ~ to 9 km and 10 to 11 km four servers, three-servers and two-servers respectively are  economical. Above 11 km haul distance single server system gives  minimum unit cost.  Transportation model is used to determine optimal allocation  of earth from different sources to different destinations. A  comparative computation of hauling cost for single-server case  and combination of multi-server vis-a-vis single-server was  carried out by using transportation model. In both cases cost  coefficients for transportation matrix are calculated using  queuing model. Results show that the hauling cost in the later  case is about 5% lesser. Thus, the models minimize the cost  for loading and hauling of earth.  Economic life of the equipment is determined minimizing the  cumulative cost. Replacement decisions for the dump trucks,  shovels and the drilling machine are based on their economic  lives. Economical life for the shovels and the dump trucks works  out respectively as 7 and 6 years though their probable life  spans are 10 years and that for the drilling machine it is 3  years against the prescribed 5 years ultimate life. Yearly  procurement schedule for equipment is prepared based on  replacement at their economic life which results in the complete  utilization of the equipment on this project for the purpose of  amortization.</abstract>
  <note>A thesis submitted in partial fulfilment of the requirements for  t h e degree of Master of Engineering, School of Engineering and Technology</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 1989</note>
  <subject authority="lcsh">
    <topic>Kra Canal project</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Construction industry</topic>
    <topic>Planning</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. ST-89-16</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B18128</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B18128</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">290798</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260817162932.0</recordChangeDate>
  </recordInfo>
</mods>