<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Applications of network techniques in the construction industry</title>
  </titleInfo>
  <name type="personal">
    <namePart>Dhirah Taechalertpaisarn</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Scott, David</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Karasudhi, Pisidhi</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Jearkjirm, Vithool</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>Canadian Government</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1978</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>66 p.</extent>
  </physicalDescription>
  <abstract>The application of Network Techniques in the construction industry is investigated. The primary purpose is to determine the completion time of a construction project and its associated probability distribution. A comparison is made among several network techniques, CPM, PERT  and simulation models using historical productivities through Monte Carlo technique as prime estimators. The result of this study is expected to give a more realistic result of the project time which will be used primarily for planning.</abstract>
  <note>A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 1978</note>
  <subject authority="lcsh">
    <topic>Network analysis (Planning)</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Construction industry</topic>
    <topic>Thailand</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. 1336</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B22933</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B22933</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">250398</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260817163021.0</recordChangeDate>
  </recordInfo>
</mods>
