02111nas|a2200253 i 450000500170000000800410001703500150005810000230007324500590009626000520015530000140020749000520022150001520027350200840042552009240050965000280143365000520146170000430151370000480155670000430160471000610164781000840170885600650179220260818153707.0121095s1985 th uu m rtt 00| a1eng d a.b104078441 aShiue, Cherng-feng10aLogistics for the construction of transmission systems aBangkok :bAsian Institute of Technology,c1985 a38, M-2 p1 aResearch studies project report ;vno. IE-85-16 aA research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology aResearch Studies Project Report (M. Eng.) - Asian Institute of Technology, 1985 aThis research deals with a transportation problem of material parts in the field of construction of transmission systems, with particular reference to the Transmission and Distribution Con struction (TDC) office of Taiwan Power Company (Taipower) . The problem ยท could be identified as a large "capacitated plant location problem". However, it was solved by a hierarchical ap proach, i.e., first, the parts allocation to each warehouse is deterimined by a mixed integer linear programming model; second, the minimum number of trucks and the specific load of each truck for each warehouse are determined by set covering model . A heuristic method and exact method for the set covering problem were studied, and it- was found that the heuristic method performed satisfactorily in this context. A case study of a transmission line construction project was made, showing the usefulness of the overall approach. 0aShippingxTaiwanxRates 0aConstruction industryxEconomic aspectsxTaiwan1 aOudheusden, Dirk L. Van, eChairperson1 aTabucanon, Mario T.,eExamination Committee1 aLu, Iuan-Yuan, eExamination Committee2 aThe Government of Republic of China, eScholarship Donor2 aAsian Institute of Technology.tResearch studies project report ;vno. IE-85-16 3Full-Textuhttp://203.159.5.9/ait-thesis/detail.php?q=B19891