<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Marginal costs of electricity supply in a predominantly hydro power system</title>
    <subTitle>case of Nepal</subTitle>
  </titleInfo>
  <name type="personal">
    <namePart>Acharya, Mahesh Prasad</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Shrestha, Ram M.</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Lapillonne, Bruno</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Codoni, Rene</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Paudyal, Guna N.</namePart>
    <role>
      <roleTerm type="text">Examintion Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>The Government of France</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1990</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <extent>115 p.</extent>
  </physicalDescription>
  <abstract>This study calculates marginal costs of electricity supply. Mixed integer  programming model has been used in the expansion planning analysis. Seasonal  marginal capacity and energy costs at generation and various voltage levels of  transmission and distribution have been calculated . For the calculation of the  marginal energy cost at generation level a linear programmine simulation model  has been used. Th e long-run mareinal capacity costs have been calculated as the  average incremental cost of the plant. These are the strict margi.nal costs of supply  without consumer related costs.  Th e marginal capac.lty costs for all voltage levels at peak periods are found  to be significantly higher than the capacity charges in the existine rates. But the  energy charge in the existing rate structure is higher t h an the average marginal  energy costs.</abstract>
  <note>A thesis submitted in partial fulfillment of the requirements of  Master of Engineering, School of Engineering and Technology</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 1990</note>
  <subject authority="lcsh">
    <topic>Hydroelectric power plants</topic>
    <topic>Nepal</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Electric utilities</topic>
    <topic>Nepal</topic>
    <topic>Costs</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. ET-90-13</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B18317</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B18317</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">280998</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818154341.0</recordChangeDate>
  </recordInfo>
</mods>
