<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>10622cam a2200313Ia 4500</leader>
  <controlfield tag="005">20260818155833.0</controlfield>
  <controlfield tag="008">121010s2010    vraa    ob    101 0 eng d</controlfield>
  <datafield tag="020" ind1=" " ind2=" ">
    <subfield code="a">9781621981077</subfield>
  </datafield>
  <datafield tag="020" ind1=" " ind2=" ">
    <subfield code="a">162198107X</subfield>
  </datafield>
  <datafield tag="035" ind1=" " ind2=" ">
    <subfield code="a">.b12257552</subfield>
  </datafield>
  <datafield tag="111" ind1="2" ind2=" ">
    <subfield code="a">International Symposium on Mine Planning and Equipment Selection</subfield>
    <subfield code="d">(2010 :</subfield>
    <subfield code="c">Fremantle, W.A.)</subfield>
  </datafield>
  <datafield tag="245" ind1="1" ind2="0">
    <subfield code="a">MPES 2010 :</subfield>
    <subfield code="b">Mine Planning &amp; Equipment Selection : proceedings /</subfield>
    <subfield code="c">edited by E. Topal and M. Kuruppu.</subfield>
  </datafield>
  <datafield tag="246" ind1="1" ind2="0">
    <subfield code="a">Mine Planning and Equipment Selection :</subfield>
    <subfield code="b">proceedings</subfield>
  </datafield>
  <datafield tag="246" ind1="1" ind2="0">
    <subfield code="a">Proceedings of the International Symposium on Mine Planning and Equipment Selection 2010</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="a">Carlton South, Vic. :</subfield>
    <subfield code="b">AusIMM,</subfield>
    <subfield code="c">2010.</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">1 online resource :</subfield>
    <subfield code="b">color illustrations.</subfield>
  </datafield>
  <datafield tag="490" ind1="1" ind2=" ">
    <subfield code="a">AusIMM publication series ;</subfield>
    <subfield code="v">11/2010</subfield>
  </datafield>
  <datafield tag="504" ind1=" " ind2=" ">
    <subfield code="a">Includes bibliographical references and index.</subfield>
  </datafield>
  <datafield tag="505" ind1="0" ind2="0">
    <subfield code="t">Open pit production scheduling optimisation -- why the mining industry needs a new phase design approach /</subfield>
    <subfield code="r">K Dagdelen --</subfield>
    <subfield code="t">Steel and iron ore scenario -- an Indian perspective /</subfield>
    <subfield code="r">V S Rao --</subfield>
    <subfield code="t">Optimisation challenges in underground mine planning and design /</subfield>
    <subfield code="r">H Rubinstein, M Brazil, P Grossman, D Lee, D Thomas and N Wormald --</subfield>
    <subfield code="t">Economics of mine planning and equipment selection /</subfield>
    <subfield code="r">I C Runge --</subfield>
    <subfield code="t">More than coal mining /</subfield>
    <subfield code="r">J Tourek --</subfield>
    <subfield code="t">The next challenge in optimising mining operations /</subfield>
    <subfield code="r">J Whittle --</subfield>
    <subfield code="t">Advances in surface mine planning design and computer application --</subfield>
    <subfield code="t">A simulation approach for the comparison of in-pit crushing and conveying truck-shovel mining methods /</subfield>
    <subfield code="r">R Bearman and S Munro --</subfield>
    <subfield code="t">Production capacity optimisation in the presence of grade uncertainty /</subfield>
    <subfield code="r">T Elkington and F Grobler --</subfield>
    <subfield code="t">Robust versus flexible open pit mine design /</subfield>
    <subfield code="r">B Groweneveld, E Topal and B Leenders --</subfield>
    <subfield code="t">The role of cost estimating in mine planning and equipment selection /</subfield>
    <subfield code="r">J B Leinart and O L Schumacher --</subfield>
    <subfield code="t">Ultimate pit limit of iron ore mines using maximum flow algorithms /</subfield>
    <subfield code="r">M Osanloo, M Rahmanpour and A Sadri --</subfield>
    <subfield code="t">A new model to improve ore grade reconsiliation between the exploration model and the mine /</subfield>
    <subfield code="r">A Parhizkar, M Ataee, P Moarefvand, V Rasouli and A H Bangian --</subfield>
    <subfield code="t">A new genetic algorithm for open pit design -- the two-dimensional case /</subfield>
    <subfield code="r">J Saavedra-Rosas --</subfield>
    <subfield code="t">Enterprise optimisation /</subfield>
    <subfield code="r">G Whittle --</subfield>
    <subfield code="t">Advances in underground mine planning design and computer application --</subfield>
    <subfield code="t">Optimisation improvements in Whittle using stope optimisation software /</subfield>
    <subfield code="r">S Keane --</subfield>
    <subfield code="t">A review of the theory and application of multi-criteria decision analysis techniques in mine planning /</subfield>
    <subfield code="r">C Musingwini --</subfield>
    <subfield code="t">An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling /</subfield>
    <subfield code="r">M Nehring, E Topal, M Kizil and P Knights --</subfield>
    <subfield code="t">Application of genetic algorithms for reliability assessment of two mine hositing systems /</subfield>
    <subfield code="r">N Vayenas, X Wu and S Peng --</subfield>
    <subfield code="t">Drilling blasting and excavation engineering --</subfield>
    <subfield code="t">Blast vibration monitoring and elastic wave reflection models to assess blast-induced damage to mine infrastructure -- an underground case study /</subfield>
    <subfield code="r">K G Fleetwood and E Villaescusa --</subfield>
    <subfield code="t">Role of physico-mechanical properties in cutting performance of diamond wire saw in marble quarrying operation /</subfield>
    <subfield code="r">S C Jain and S S Rathore --</subfield>
    <subfield code="t">Never touch a running system? Longwall cutting sequences and their potential /</subfield>
    <subfield code="r">K Nienhaus and S Hetzel --</subfield>
    <subfield code="t">Developing algorithms and a computer program to predict the peak particle velocity after blasting in open pit mines and quarries /</subfield>
    <subfield code="r">I&#x207A;&#x458; Topal, B Elevli and K Erarslan --</subfield>
    <subfield code="t">Environmental issues in surface and underground mining --</subfield>
    <subfield code="t">Numerical modelling of monorail support requirements in decline development /</subfield>
    <subfield code="r">B Besa, M Kuruppu and E K Chanda --</subfield>
    <subfield code="t">Case study -- The Mogiana quarry reclamation /</subfield>
    <subfield code="r">A Curi and O Quaglio --</subfield>
    <subfield code="t">Study on utilisation of Flyash for barrier layer/buffer materials for radioactive waste disposal /</subfield>
    <subfield code="r">T Sasaoka, H Shimada and K Matsui --</subfield>
    <subfield code="t">Fundamental study of acid drainage control using Flyash /</subfield>
    <subfield code="r">H Shimada, T Sasaoka, K Matsui, G J Kusuma, J Oya, H Takamoto, S Kramadibrata and S Sulistianto --</subfield>
    <subfield code="t">Mine automation --</subfield>
    <subfield code="t">Simulation for dependable mining automation /</subfield>
    <subfield code="r">N Hillier and J Ryde --</subfield>
    <subfield code="t">Coal bed boundary detection using infrared technology for longwall shearer automation /</subfield>
    <subfield code="r">K Nienhaus, F Mavroudis and M Warcholik --</subfield>
    <subfield code="t">Advances in continuous miner automation /</subfield>
    <subfield code="r">J C Ralston, M T Dunn, C Hargrave and D C Reid --</subfield>
    <subfield code="t">Path planning and position control for autonomous loading operation by wheel loader /</subfield>
    <subfield code="r">S Sarata and N Koyachi --</subfield>
    <subfield code="t">Mine equipment selection, utilisation and maintenance --</subfield>
    <subfield code="t">A non-linear programming model for open pit mine equipment selection /</subfield>
    <subfield code="r">A Aghajani Bazzazi, M Osanloo and B Karimi --</subfield>
    <subfield code="t">Equipment selection -- what is the issue? What about the application of simulation packages? /</subfield>
    <subfield code="r">M Campbell --</subfield>
    <subfield code="t">Improvement of mechanical tool performance by waterjet assistance /</subfield>
    <subfield code="r">R Ciccu and B Grosso --</subfield>
    <subfield code="t">Optimum equipment management through life cycle costing /</subfield>
    <subfield code="r">B Hall --</subfield>
    <subfield code="t">Precision surface mining -- choosing the best tool for the job /</subfield>
    <subfield code="r">J Hutchins --</subfield>
    <subfield code="t">Software tools for open pit trucking studies /</subfield>
    <subfield code="r">S Law --</subfield>
    <subfield code="t">Infrared imager as a tool for monitoring of power shovels, gearcase bearings and electric motos /</subfield>
    <subfield code="r">V Sergeev, M Zhuravlev and R Y Poderni --</subfield>
    <subfield code="t">The EMESRT approach to equipment design -- bringing end users into the picture /</subfield>
    <subfield code="r">G von Horsten --</subfield>
    <subfield code="t">Mine feasibility case studies --</subfield>
    <subfield code="t">Ranking of belt conveyor systems for prefeasibility study /</subfield>
    <subfield code="r">E Y Baafi and D A Bedward --</subfield>
    <subfield code="t">BATMIN -- Business analysis tools for mining /</subfield>
    <subfield code="r">D Heugh --</subfield>
    <subfield code="t">Preliminary study on the improvement of afforestation techniques applied to aggregate mines in Japan /</subfield>
    <subfield code="r">Y Sakai, Y Sato, K Matsui, H Shimada and T Sasaoka --</subfield>
    <subfield code="t">Reopening and production planning of Kirdar -- Yoncali Quarry, Turkey /</subfield>
    <subfield code="r">I&#x207A;&#x458; Topal, B Elevli, H Akc&#x207A;&#x2B9;akoca, K Og&#x207A;&#x457;ul and M M Gu&#x207A;lec&#x207A;&#x2B9; --</subfield>
    <subfield code="t">Mine health, safety and environment --</subfield>
    <subfield code="t">Assessment of occupational exposure to whole-body vibration for drivers of mining equipment /</subfield>
    <subfield code="r">V Dentoni, G Massacci and L Piras --</subfield>
    <subfield code="t">'She'll be Right Mate' -- Culture and safety /</subfield>
    <subfield code="r">P Milnes, N S Melkoumian, D Mather, T Milnes, A Stewart and L Tan --</subfield>
    <subfield code="t">Using haulage accidents and incident reports to identify the impact of substandard haul road design on operational safety /</subfield>
    <subfield code="r">R J Thompson --</subfield>
    <subfield code="t">Prediction of near-field rock damage due to production blasting in limestone quarries, Japan /</subfield>
    <subfield code="r">S Wahyudi, H Shimada, T Sasaoka, S Kubota, Y Ogata and K Matsui --</subfield>
    <subfield code="t">Mine planning and block modelling --</subfield>
    <subfield code="t">Hierarchical clustering algorithm for block aggregation in open pit mines /</subfield>
    <subfield code="r">H Askari-Nasab, M Tabesh, M M Badiozamani and H Eivazy --</subfield>
    <subfield code="t">Operative expert estimation of innovative policy of mining enterprise technological development using sustainable development principles /</subfield>
    <subfield code="r">S Zh Galiyev, A A Boyandinova and K K Zhussupov --</subfield>
    <subfield code="t">Investigating the sensitivity of different estimation techniques over block dimensions /</subfield>
    <subfield code="r">A Hekmat and M Osanloo --</subfield>
    <subfield code="t">A new effective labour-planning model for mines /</subfield>
    <subfield code="r">L D Meyer --</subfield>
    <subfield code="t">Mining methods and planning --</subfield>
    <subfield code="t">Mass mining using room and pillar methods at Estonia Oil Shale Mine /</subfield>
    <subfield code="r">R Freeman and O Nikitin --</subfield>
    <subfield code="t">A tool for benchmark study of roadway development performances /</subfield>
    <subfield code="r">G Gibson and E Y Baafi --</subfield>
    <subfield code="t">Planning the Kotre Basantpu-Pachmo Coking Coal Mine /</subfield>
    <subfield code="r">M D O'Brien, R Srikanth, A L Visdale and G M Springbett --</subfield>
    <subfield code="t">Mining the LG6 Chromitite layer -- a comparison of two approaches /</subfield>
    <subfield code="r">S M Rupprecht --</subfield>
    <subfield code="t">Mining system monitoring and simulation --</subfield>
    <subfield code="t">Computer simulation of roadway development to support longwall mining /</subfield>
    <subfield code="r">E Y Baafi and I Porter --</subfield>
    <subfield code="t">Information and methodical base of simulation modelling of excavator-truck-conveyor complex operation /</subfield>
    <subfield code="r">S Zh Galiyev, A A Boyandinova and Zh A Adilkhanova --</subfield>
    <subfield code="t">Simulation and animation model for the Millerton Coal Mine (New Zealand) /</subfield>
    <subfield code="r">T O'Connell and J R Sturgul --</subfield>
    <subfield code="t">Performance evaluation of machinery used in dimensional stone mining and processing /</subfield>
    <subfield code="r">S S Rathore and S C Jain --</subfield>
    <subfield code="t">Rock mechanics, geotechnical applications and mine environment --</subfield>
    <subfield code="t">A comparison of rebar and spiral bolts using laboratory pull-out tests /</subfield>
    <subfield code="r">S S Kang, D K Je, A Hirata and D Kim --</subfield>
    <subfield code="t">Determination of fracture toughness of anisotropic rocks under water vapour pressure by semi-circular bend test /</subfield>
    <subfield code="r">M Kuruppu, Y Obara and M Kataoka --</subfield>
    <subfield code="t">Performance of the coal mine openings and pillars in anisotropic stress field /</subfield>
    <subfield code="r">O&#x207A; Yulmaz and T U&#x207A;nlu&#x207A; --</subfield>
    <subfield code="t">Fundamental study on fracturing grouting for shaft lining reinforcement at deep alluvium seam in eastern China /</subfield>
    <subfield code="r">Q Yu, H Shimada, T Sasaoka and K Matsui --</subfield>
    <subfield code="t">Sustainable development of mining resources --</subfield>
    <subfield code="t">The application of fuzzy analytical hierarchy processing to define optimal post mining land use for pit area to recognise reclamation costs in open pit mining /</subfield>
    <subfield code="r">A H Bangian, M Ataei, A Sayadi and A Gholinejad --</subfield>
    <subfield code="t">The effect of the Australian carbon trading scheme on a large scale open pit mining operation /</subfield>
    <subfield code="r">E Chanda, F Ball, J Dunstan, H Maier, P Mumford and C Shaw --</subfield>
    <subfield code="t">Energy conservation in the Indian mining industry -- an overview /</subfield>
    <subfield code="r">G K Pradhan.</subfield>
  </datafield>
  <datafield tag="505" ind1="0" ind2="0">
    <subfield code="t">Poster papers --</subfield>
    <subfield code="t">System optimisation of design and scheduling of open pit mining operations /</subfield>
    <subfield code="r">B Bekmurzayev, D Bukeikhanov and Y Zulkarnayev --</subfield>
    <subfield code="t">Mining environmental impacts evaluation in a Karstic zone using geographical information systems /</subfield>
    <subfield code="r">A Curi and V C Garcia --</subfield>
    <subfield code="t">Defining optimal post-mining land use for different sections of mined land through different multi-attribute decision-making techniques in open pit mining /</subfield>
    <subfield code="r">A Gholinejad and A H Bangian --</subfield>
    <subfield code="t">Application of multi-slicing highwall mining system with stowing at surface coal mine in Thailand /</subfield>
    <subfield code="r">A Hamanaka, T Sasaoka, H. Shimada, K Matsui, H Takamoto, P Meechumna and P Laowattanabandit --</subfield>
    <subfield code="t">Adaptation of hydraulic shovels for artic temperature of Yakutia region /</subfield>
    <subfield code="r">R Y Poderni and H R Koelsh --</subfield>
    <subfield code="t">An innovative scaled model to simulate the perimeter hole blasting in tunnel /</subfield>
    <subfield code="r">H-S Yang, H-D Jang, W-B Kim and P Rai --</subfield>
    <subfield code="t">Systematic monitoring of operation of mining companies and branches /</subfield>
    <subfield code="r">A Zharmenov, S Galiev, A Lisenkov and S Zhumabekova --</subfield>
    <subfield code="t">Role of ore preparation during chrysotile manufacturing /</subfield>
    <subfield code="r">K K Zhusupov and S Y Punenkov.</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Mines and mineral resources</subfield>
    <subfield code="x">Equipment and supplies</subfield>
    <subfield code="v">Congresses.</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Mines and mineral resources</subfield>
    <subfield code="z">Australia</subfield>
    <subfield code="v">Congresses.</subfield>
  </datafield>
  <datafield tag="710" ind1="2" ind2=" ">
    <subfield code="a">Australasian Institute of Mining and Metallurgy.</subfield>
  </datafield>
  <datafield tag="856" ind1="4" ind2="0">
    <subfield code="3">Download: Knovel</subfield>
    <subfield code="u">https://app.knovel.com/hotlink/toc/id:kpMPESMPE6/mine-planning-equipment/mine-planning-equipment</subfield>
  </datafield>
  <datafield tag="907" ind1=" " ind2=" ">
    <subfield code="a">.b12257552</subfield>
    <subfield code="b">mngc </subfield>
    <subfield code="c">n</subfield>
  </datafield>
  <datafield tag="902" ind1=" " ind2=" ">
    <subfield code="a">251209</subfield>
  </datafield>
  <datafield tag="998" ind1=" " ind2=" ">
    <subfield code="b">0</subfield>
    <subfield code="c">190207</subfield>
    <subfield code="d">e</subfield>
    <subfield code="e">h  </subfield>
    <subfield code="f">n</subfield>
    <subfield code="g">0</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">78801</subfield>
    <subfield code="d">78801</subfield>
  </datafield>
</record>
