<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>02645nam a2200301 a 4500</leader>
  <controlfield tag="005">20260818170016.0</controlfield>
  <controlfield tag="008">                                        </controlfield>
  <datafield tag="035" ind1=" " ind2=" ">
    <subfield code="a">.b12340066</subfield>
  </datafield>
  <datafield tag="100" ind1="0" ind2=" ">
    <subfield code="a">Nara Samattapapong</subfield>
  </datafield>
  <datafield tag="245" ind1="1" ind2="2">
    <subfield code="a">A new throughput forecasting model for disk drive automated test operation</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="a">Pathumthani :</subfield>
    <subfield code="b">Asian Institute of Technology,</subfield>
    <subfield code="c">2016</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="e">1 online resource</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">A dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy in Mechatronics, School of Engineering and Technology</subfield>
  </datafield>
  <datafield tag="520" ind1=" " ind2=" ">
    <subfield code="a">The production throughput volume is a key performance index of hard disk drive manufacturing systems that need to be forecast. Because of the production throughput forecasting result is useful information for the management team to respond to any changes in production processes and resource allocation. However, a practically forecasting system for production throughput has not been described in detail yet and also a new forecasting system has not been proposed for a decade. This study describes a pragmatic procedure to develop forecasting system for production throughput in the automated test operation of the hard disc drives manufacturing factory. The procedures consist of three main stages. The first stage, selecting relevant inputs into the forecasting model was adopted mutual information method. In the second stage, generalized regression neural network was used in the forecasting model development phase. Finally, forecasting accuracy was improved by using the interval halving optimization method. The experiments were conducted on a real data set from the final testing operation of the hard disk drive manufacturing factory by using a Visual Basic Application on Microsoft Excel&#xA9; to develop a preliminary forecasting system on testing and the verification process. The experimental result shows that the proposed model is superior to the performance of the current forecasting system.</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Data disk drives</subfield>
    <subfield code="x">Testing</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Forecasting</subfield>
  </datafield>
  <datafield tag="700" ind1="1" ind2=" ">
    <subfield code="a">Afzulpurkar, Nitin V.,</subfield>
    <subfield code="e">Examination Committee</subfield>
  </datafield>
  <datafield tag="700" ind1="1" ind2=" ">
    <subfield code="a">Huynh, Trung Luong,</subfield>
    <subfield code="e">Examination Committee</subfield>
  </datafield>
  <datafield tag="700" ind1="0" ind2=" ">
    <subfield code="a">Manukid Parnichkun,</subfield>
    <subfield code="e">Examination Committee</subfield>
  </datafield>
  <datafield tag="700" ind1="0" ind2=" ">
    <subfield code="a">Chittiporn Pupaichikul,</subfield>
    <subfield code="e">Examination committee</subfield>
  </datafield>
  <datafield tag="700" ind1="1" ind2=" ">
    <subfield code="a">Bohez, Erik L.J.,</subfield>
    <subfield code="e">Examination Committee</subfield>
  </datafield>
  <datafield tag="710" ind1="2" ind2=" ">
    <subfield code="a">Suranaree University of Technology,</subfield>
    <subfield code="e">Scholarship donor</subfield>
  </datafield>
  <datafield tag="856" ind1=" " ind2=" ">
    <subfield code="3">Full-Text</subfield>
    <subfield code="u">http://203.159.5.9/ait-thesis/detail.php?q=B04721</subfield>
  </datafield>
  <datafield tag="907" ind1=" " ind2=" ">
    <subfield code="a">.b12340066</subfield>
    <subfield code="b">mnait</subfield>
    <subfield code="c">j</subfield>
  </datafield>
  <datafield tag="902" ind1=" " ind2=" ">
    <subfield code="a">240423</subfield>
  </datafield>
  <datafield tag="998" ind1=" " ind2=" ">
    <subfield code="b">0</subfield>
    <subfield code="c">200108</subfield>
    <subfield code="d">m</subfield>
    <subfield code="e">a  </subfield>
    <subfield code="f">j</subfield>
    <subfield code="g">2</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">81007</subfield>
    <subfield code="d">81007</subfield>
  </datafield>
</record>
