02110nas a2200241 450000500170000000800410001703500150005810000190007324500620009226000520015430000100020649000260021650001440024250200580038652011010044465000510154570000290159670000390162570000390166471000420170381000580174585600650180320260818170321.0011298s1987 th r 000| 0eng d a.b104718811 aLee, Kauk Pein10aNutrient removal in intermittent activated sludge process aBangkok :bAsian Institute of Technology,c1987 a64 p.1 aThesis ;vno. EV-87-6 aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology aThesis (M.Eng.) - Asian Institute of Technology, 1987 aPotential of nutrient removal in Intermittent Activated Sludge Process w s studied with three laboratory - scale reactors by using synthetic wastewater containing organic matter and am onia as sub tr te. Three difrerent oper ting strategies were applied in order to find the potential of nitrogen and phosphorus r mova1. Different duration of anoxic/ naerobic. anoxic nd aerobic phases were applied in three reactors of each strategy. Based on the results fro this study. nitrifying b ct ri w re able to urvive and a1 0 gav satisfactory perform nce under th equence of anoxic - aerobic environment. Applying sequence of noxic - aerobic ph ses in the reactor during long period of substrate fe ding can get the relatively high nitrogen re ov 1 efficiency. Nitrogen removal by endogenous denitrification lso play significant role in the strategy where short feeding period was used. Biological phosphorus removal, so called "luxury uptake". was not ob rved in this study. High removal (95 - 99%> of TOC w maintained in all three str tegies of inter ittent activated sludge process.  0aSewagexPurificationxActivated sludge process1 aHanaki, K.,eChairperson1 aOrth, H.M.,eExamination Committee1 aShin, H.S.,eExamination Committee2 aFrench Government,eScholarship Donor2 aAsian Institute of Technology.tThesis ;vno. EV-87-6 3Full-Textuhttp://203.159.5.9/ait-thesis/detail.php?q=B19200