Nguyen Xuan Hoang

Owner's design management in EPC project : a case study of civil work of Vung Ang 1 Thermal Power Plant - Pathum Thani, Thailand : Asian Institute of Technology, 2015 - 69 leaves : ill. - Project ; no. MPM-CM-15-41 . - Asian Institute of Technology. Project ; no. MPM-CM-15-41 .

A project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management, School of Engineering and Technology

Project (M. Eng.) - Asian Institute of Technology, 2015

The implementation of construction project in the form of EPC was applied in Vietnam from the la te 90s of the twentieth century. Many EPC projects have been successful, but also many projects behind schedule, cost overrun. The result of this situation is that the Owners design management has not been adequate attention. Better understanding of the situation, the report has been studied the Owners civil design management in EPC project as Vung Ang 1 thermal power plant from Feasibility phase to EPC phase. The research also analyze strengths, weakness of th e project and develop a framework of design management in EPC project. In addition, some recommendations were suggested to improve the design quality of power thermal projects


Construction projects--Vietnam
Vung Ang Thermal Power Plant (Vietnam)