TY - SER AU - Nguyen Xuan Hoang AU - Hadikusumo,Bonaventura H.W. AU - Chotchai Charoenngam, AU - Wasan Teerajetgul, ED - Vietnam Oil and Gas Group, TI - Owner's design management in EPC project: a case study of civil work of Vung Ang 1 Thermal Power Plant T2 - Project PY - 2015/// CY - Pathum Thani, Thailand PB - Asian Institute of Technology KW - Construction projects KW - Vietnam KW - Vung Ang Thermal Power Plant (Vietnam) N1 - A project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management, School of Engineering and Technology; Project (M. Eng.) - Asian Institute of Technology, 2015 N2 - The implementation of construction project in the form of EPC was applied in Vietnam from the la te 90s of the twentieth century. Many EPC projects have been successful, but also many projects behind schedule, cost overrun. The result of this situation is that the Owner{u2019}s design management has not been adequate attention. Better understanding of the situation, the report has been studied the Owner{u2019}s civil design management in EPC project as Vung Ang 1 thermal power plant from Feasibility phase to EPC phase. The research also analyze strengths, weakness of th e project and develop a framework of design management in EPC project. In addition, some recommendations were suggested to improve the design quality of power thermal projects UR - http://203.159.5.9/ait-thesis/detail.php?q=B01128 ER -