    <title>Performance of earth pressure balance shield in Bangkok waste water tunnel project</title>
  </titleInfo>
  <name type="personal">
    <namePart>Koson Kongdang</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Noppadol Phien-Wej</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Balasubramaniam, A.S.</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Sugimoto, M.</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1996</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>168 leaves</extent>
  </physicalDescription>
  <abstract>In this study the performance of the Earth Pressure Balance Shield in Bangkok Waste  Water Tunnel Project Stage-1 was evaluated and summarized. The activities associated with the  tunnel construction by using EPBS was analyzed with respect to the time used in each activity,  the average of excavation time and the delay time were 51.49% and 48.51 % respectively. The  penetration rate and the advance rate were 1.57 m/hr and 8.4 m/day respectively . Jack thrust  capacity used was 15 .25% of the design. The tunnel construction procedure by using EPBS has  been studied including the associated shaft construction. Ground surface settlement was  observed along the tunnel route respected to the shield advancement. The maximum ground  surface settlement was 10 - 30 mm in stiff clay and 20 - 40 mm in soft clay layer. The ground  loss was up to 5% due to the low efficiency of grouting. As a result from this study, the  performance of EPBS was given the high progressive work, less of problem during construction  and induced the small amount of ground surface settlement, therefore the EPBS was suitable for  tunnel construction in Bangkok subsoils.</abstract>
  <note>A thesis submitted in partial fulfilment of the requirements for the degree of Master of Science, School of Civil Engineering </note>
  <note>Thesis (M. Sc.) - Asian Institute of Technology, 1996</note>
  <subject authority="lcsh">
    <topic>Shields (Geology)</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. GE-95-27</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B15160</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B15160</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">      </recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818171610.0</recordChangeDate>
  </recordInfo>
</mods>