<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Production planning and scheduling for injection moulding of pipe fittings</title>
  </titleInfo>
  <name type="personal">
    <namePart>Wanchai Doungsuwan</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Nagarur, Nagendra N.</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Oudheusden, Dirk L. van</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Ramanathan, Krishnamurthy</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>The Siam Cement Co.,Ltd</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1991</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>64, [65] p.</extent>
  </physicalDescription>
  <abstract>The present study concerns the development and implementation of  production planning and scheduling models for injection moulding of pipe  fittings in Thailand. The objective of the study is to minimize the total  cost of production, inventory, and shortage. A Hierarchical Production  Planning (HPP} approach with three stages is applied to solve this problem.  Firstly, due to complexity of a large variety of product types and  multi non-identical parallel machines, the product and machine  classification are grouped by using technical characteristics, machine  capability utilization, and load balancing. Then each group of products  and machines is treated as a multi product and one machine subproblem.  Secondly, goal programming models are formulated for the product-mix  planning of each subproblem under a three month rolling plan period. Linear  programming packages are used in the computations, utilizing both mainframe  and personal computers.  Thirdly, heuristic methods are developed to solve the parallel machine  scheduling problem for the first planning month. The heuristic methods are  written in Lotus Macro program for personal computer.  Finally, the results obtained from the proposed procedure are compared  with the existing intuitive procedure. Many aspects of sensitivity  analysis are also presented. This study puts emphasis on how these models  can be practically implemented.</abstract>
  <note>A thesis submitted in partial fulfillment of the requirements for  the degree of Master of Engineering, School of Engineering and Technology</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 1991</note>
  <subject authority="lcsh">
    <topic>Production planning</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Pipe-fittings</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. IE-91-9</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B17656</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B17656</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">260698</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818174626.0</recordChangeDate>
  </recordInfo>
</mods>
