<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Asset management in public and public private partnership (PPP) hydropower stations in Nepal</title>
  </titleInfo>
  <name type="personal">
    <namePart>Lakhe, Raj Kumar</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Chotchai Charoenngam</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Hadikusumo, Bonaventura H. W.</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Poovadol Sirirangsi</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>ADB-JSP</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <genre authority="marc">series</genre>
  <genre authority="marc">technical report</genre>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Pathum Thani, Thailand</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>2010</dateIssued>
    <issuance>continuing</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <extent>1 online resource (74 leaves) : ill.</extent>
  </physicalDescription>
  <abstract>The  hydropower  organizations  in  Nepal  are  constantly  striving  to  ascertain  the  value addition  to  its  stakeholders.  Traditional  delivery system  alone  has  not  been  able  to  fulfill and   sustain   hydropower   development.   To   overcome   this   limitation,   public   private partnership  (PPP)  has  been  introduced  as  an  innovative  public  policy  tool  for  the  need  of dynamism  in  traditional  delivery  approach.  Despite the  abundant  hydropower  potential  in the  country,  the  electricity  generation  is  inadequate,  unreliable  and  expensive.  A  part  of these consequences can be attributed to hydropower asset management. In this connection, this  study  attempts  to  investigate  the  existing  asset  management  practices  in  public  and PPP hydropower stations of Nepal.  Based  on  the  verified  investigation  criteria,  each of  two  public  and  PPP  hydropower stations   are   investigated   through   direct   interview with   station   managers   and   site observations.  The  results  are  analyzed  using  explanation  building  as  the  specific  analytic approach  in  the  case  study.  The  distinct  features  of  asset  management  in  public  and  PPP practices are identified, analyzed and highlighted.The  research  findings  reflect  that  both  public  and PPP  practices  are  weak  in  managing hydropower  assets  in  Nepal.  The  cross  case  synthesis  implies  that  within  public  and  PPP power  stations,  there  are  significant  differences  in  asset  management  practices.  However reduced  cost  of  financing,  though  initial  investment  is  higher  by  35%  than  in  PPP, maintaining minimum balance of spare parts and lower operation and maintenance cost are identified in the public practices. While, PPP practices have revealed better structured asset management  in  terms  of  project  implementation,  stakeholder  relationship,  organizational development,   maintaining   asset   database,   monitoring   asset   condition   and   carrying preventive  maintenance  for  high  reliability  which  has  resulted  maximum  plant  utilization and higher productivity.</abstract>
  <note>A thesis submitted in partial fulfillment of the requirement for the   degree of Master of Engineering in  Construction Engineering and Infrastructure Management</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 2010</note>
  <subject authority="lcsh">
    <topic>Public-private sector cooperation</topic>
    <geographic>Nepal</geographic>
  </subject>
  <subject authority="lcsh">
    <topic>Hydroelectric power plants</topic>
    <geographic>Nepal</geographic>
  </subject>
  <subject authority="lcsh">
    <topic>Asset-liability management</topic>
    <geographic>Nepal</geographic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. CM-10-04</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B01931</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B01931</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">110104</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260817163737.0</recordChangeDate>
  </recordInfo>
</mods>