<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Pumped storage operation study by simulation Choshui River, Taiwan, R.O.C</title>
  </titleInfo>
  <name type="personal">
    <namePart>Wang, Hui-sheng</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Tawatchai Tingsanchali</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Selvalingam, Selvadore</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>I, Fude</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>Taiwan Power Company, R.O.C</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1981</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>vi, 37 p.</extent>
  </physicalDescription>
  <abstract>A simulation model is developed to represent the overall Choshui  River system with and without considering the pumped storage plants.  The overall system consists of six reservoirs or ponds, two pumped storage  plants and five conventional hydro powerplants. The reservoirs and power plants are connected both in series and in parallel. The system generates hydropower and provides water for irrigation and downstream  water requirements. The hydrological data used cover 26 years from 1954 to 1979.  The most feasible combination of the Wusheh and Sun Moon Lake rule curves is recommended based upon the maximum power generation and minimum water shortage for irrigation. When the pumped storage plants are added to the system, the peak and off-peak power rates are considered. The systems power generation is divided into two parts, peak and off-peak energy. Power rates corresponding to peak and off-peak energy are used to calculate the power benefit. The operating policy which yields the maximum power benefit is selected.</abstract>
  <note>A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 1981</note>
  <subject authority="lcsh">
    <topic>Pumped storage power plants</topic>
    <topic>Taiwan</topic>
    <topic>Choshui River</topic>
    <topic>Simulation methods</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. WA-80-19</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B21798</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B21798</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">130598</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818175150.0</recordChangeDate>
  </recordInfo>
</mods>
