000 02770nas a2200337 a 4500
005 20260818213226.0
008 230706s2020 th m rtt 000 a eng
035 _a.b12408037
099 9 _aAIT Proj. no.MPM-CM-20-15
100 0 _aPham Quang Huy
245 1 0 _aSafety management in construction :
_ba case study of the empire city project
260 _aPathum Thani, Thailand :
_bAsian Institute of Technology,
_c2020
300 _a90 leaves :
_bill.
490 1 _aProject;
_vno. MPM-CM-20-15
500 _aA project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management
502 _aProject (M. Eng.) - Asian Institute of Technology, 2020
520 _aIt is true that high-rise building requires a lot of planning and one of the most important that need to be covered is safety planning. There is numerous data which demonstrates that a well-designed safety management system can help the project in term of reducing accidents, incidents, injuries or illnesses. In addition, a well-prepared management system also supports the project of improving productivity and quality, creating a great working environment and obtaining lots of benefits for company. The famous slogan in many years 2Safety First!3 can show how important of safety in not only construction industry but also other businesses. However, safety in construction project is always a tremendous problem which is difficult but not impossible to solve. By updating the management system frequently, the manager can develop the status of safety better. Vietnam is taking steps to reduce accidents and incidents in construction project as much as possible but the statistic of safety still not performs as expected. By evaluating the case study of the safety management plan used in the Empire City project, I would like to analyze the strengths, weaknesses and give recommendations to improve the management system by setting up a framework of safety procedure.
650 0 _aConstruction industry
_xSafety measures
_zVietnam
700 1 _aHadikusumo, Bonaventura H. W.,
_eChairperson
700 0 _aChotchai Charoenngam,
_eExamination Committee
700 0 _aSakul Pochanart,
_eExamination Committee
810 2 _aAsian Institute of Technology.
_tProject;
_vno. MPM-CM-20-15
856 4 0 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B19406
907 _a.b12408037
_bmnait
_cm
902 _a250421
998 _b0
_c230706
_dm
_ea
_fm
_g0
945 _lmnarc
942 _c67
909 _aBarcode : -
_bCREATED : 2023-04-07
_cRECORD # : i13454493
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c103832
_d103832