| 000 | 03484nam|a2200433 i 4500 | ||
|---|---|---|---|
| 005 | 20260818223133.0 | ||
| 008 | 010299s1987 th 0000|0 eng d | ||
| 035 | _a.b10044619 | ||
| 099 | 9 | _aAIT Thesis no.GT-86-07 | |
| 100 | 1 | _aYu, Ter-chyuan | |
| 245 | 1 | 2 | _aA study of the behaviour of driven piles at Hsin-ta power plant & Kaohsiung harbor, Southern Taiwan |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1987 |
||
| 300 | _a200 p. | ||
| 490 | 1 |
_aThesis ; _vno. GT-86-07 |
|
| 500 | _aA thesis submitted in partial fulfilment of the requirements for the degree of Master of Engineering, School of Engineering and Technology | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 1987 | ||
| 520 | _aPile foundation practice in Southern Taiwan is reviewed and discussed in relation to the relevant available literature. Two case histories in Southern Taiwan are studied and evaluated through an analysis of the geotechnical aspects of the driven piles. Detailed investigations of subsurface conditions are made for the design for the bearing capacities of piles which has been revealed that t he heavy loads can be supported by piles at sand layer. Therefore , to estimate the ultimate static pile capacity in cohesion less soils is used by Meyerhof Empirical Method, Japanese Building Standard, Meyerhof Analytical Method, DM-7 Method, and Norlund Analytical Method . The Hiley formula is used to predict the dynamic pile capacity. Beside, the results of pile load test are interpreted through analysis, comparisons and discussions by various methods. Usually, pile load test are carried out to serve as a proof test to check the ultimate pile capacity. Found to be that the Norlund Analytical Method matched with Vander ' s method can be performed to estimate the static pile capacity in Southern Taiwan area, the results of Hiley formula can also be taken as reference to predict pile capacity. Finally, discussions and conclusions are summarized s o that it can serve as a guideline for future geotechnical considerations for installation of piles. | ||
| 650 | 0 | _aPiling (Civil engineering) | |
| 700 | 1 |
_aBalasubramaniam, A.S., _eChairperson |
|
| 700 | 1 |
_aChandra, Sarvesh, _eCo-Chairperson |
|
| 700 | 1 |
_aBergado, Dennes T., _eExamination Committee |
|
| 710 | 2 |
_aRet-Ser Engineering Agency, R.O.C., _eScholarship Donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. GT-86-07 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B19260 |
||
| 907 |
_a.b10044619 _bmnait _cs |
||
| 902 | _a250606 | ||
| 998 |
_b2 _c951012 _dm _ea _fs _g2 |
||
| 945 | _lmnait | ||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 945 | _lmnarc | ||
| 942 | _c20 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120652622 _bCREATED : 1995-10-13 _cRECORD # : i10033270 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050003014098 _bCREATED : 1995-10-13 _cRECORD # : i10033282 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050160052204 _bCREATED : 2016-05-23 _cRECORD # : i12986203 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050120926620 _bCREATED : 2019-11-12 _cRECORD # : i13239399 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c114935 _d114935 |
||