000 04014nam a2200409 4500
005 20260818224141.0
008 091198 1986 th r 0000|0 eng d
035 _a.b10667982
099 9 _aAIT Thesis no.HS-86-01
100 1 _aHelling, Andrew Louis
245 1 0 _aTechnology adaptation for rural development :
_bassessing Thailand's micro-hydropower program
260 _aBangkok :
_bAsian Institute of Technology,
_c1986
300 _a258 p.
490 1 _aThesis ;
_vno. HS-86-01
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1986
520 _aA comprehensive assessment of the Thai National Energy Administration's Micro-Hydropower (MHP} Program is carried out in the general context of evaluating participatory rural infrastructure development programs. Principle aspects studied include: technical adaptation of component designs and construction methods, institutional forms and linkages, and benefits realized by participating village communities. Data collection methods employed were study of project documents, direct participant observation in planning and implementation activities, and scanning surveys/rapid appraisal of rural project sites. Findings centered on the adaptation of designs to maximize use of local resources-at the village level for civil works and within the urban sector for manufactured hydro-electric components; on the importance of flexible response and of vertical and horizontal linkages to the effectiveness of the program implementation unit; on the role of participation in the function of Village Electricity Cooperatives; and on the limited application of MHP generated electricity for non-domestic applications in project areas. Problems identified include inequitable exclusion of some low income-labor contributing households from consumption of electricity; lack of income, employment, and savings generating application of electricity in project areas; reported frequent outages and potential future limitations on peak power consumption; and the lack of a systematic project selection approach to planning MHP projects. Exploratory analyses are carried out of the feasibility of revolving credit provision for financing household connections, of initiating cooperative village rice-milling components in project areas, of reducing per-household investment costs and increasing reliability by implementing mixed DC/AC delivery systems, and of implementing a rational area-based integrated framework for MHP-grid extension planning in hilly regions. Recommendations follow based on these discussions for maximizing benefits realized by rural households from investments in rural electrification in remote regions with decentralized hydropower potential.
650 1 0 _aTechnology
_xThailand
650 1 0 _aRural development
_xThailand
700 1 _aDemaine, Harvey,
_eChairperson
700 1 _aLucas, N.J.D.,
_eExamination Committee
700 0 _a Prida Thimakorn,
_eExamination Committee
700 1 _a Yapa, Lakshman S.,
_eExamination Committee
710 2 _aCanadian International Development Agency-Broad Based Development Program (CIDA-BBDP),
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. HS-86-01
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B19709
907 _a.b10667982
_bmnait
_cs
902 _a260107
998 _b2
_c951012
_dm
_ea
_fs
_g0
945 _lmnait
945 _lmnarc
942 _c22
942 _c40
909 _aBarcode : 30050120734081
_bCREATED : 2014-05-21
_cRECORD # : i12802323
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050120305692
_bCREATED : 2016-01-06
_cRECORD # : i13007737
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c118846
_d118846