| 000 | 03332nas|a2200433 i 4500 | ||
|---|---|---|---|
| 005 | 20260817171405.0 | ||
| 008 | 210400s1999 th uzm rtt 00| a1eng d | ||
| 035 | _a.b11785925 | ||
| 099 | 9 | _aAIT Thesis no.ISE-99-22 | |
| 100 | 0 | _aTin Zaw Moe | |
| 245 | 1 | 0 | _aBill of materials generation in ERP environment |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1999 |
||
| 300 |
_a98 p.: _bill. |
||
| 490 | 1 |
_aThesis ; _vno. ISE-99-22 |
|
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology | ||
| 500 | _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Advanced Technologies | ||
| 520 | _aDeveloping a bill of material for a product having many optional features is certainly a cumbersome task. If a separate BOM were used for each unique end product, the file size would be too big and difficult to maintain. The solution to this problem is the modular bill of materials. This study concerns about modular bill of materials and process bill of materials. Modular bill of material, which is used for improvement of material planning, as the result the demand for modules can be forecasted separately with much more accuracy than the final configurations. Process bill of materials, which is used for delivery of components to the process in order to supply right components to the right production point, as the result, reduce the complexity and lessen the production time of the production department. Computer aided design (CAD) and manufacturing resource planning (MRP II) are two major basic paiis, which exist in manufacturing. The Part Master Record (PMR) and the Bill of Materials (BOM) information, which are common to CAD and MRP II systems. This information is entered into the MRP II system manually. The entire process is extremely time consuming and error prone. This study aims to solve the problem through integration between CAD-MRP II systems, to achieve accurate and timely exchange of information between CAD and MRP II. The use of paper for information transfer could be virtually eliminated. | ||
| 650 | 0 | _aMaterial requirements planning | |
| 650 | 0 | _aEnterprise resource planning | |
| 700 | 1 |
_aHasin, M.A.A., _eChairperson |
|
| 700 | 1 |
_aBohez, Erik L.J., _eExamination Committee |
|
| 700 | 1 |
_aNaber, Helmut, _eExamination committee |
|
| 710 | 2 |
_aAIT Partial Scholarship, _eScholarship donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. ISE-99-22 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B12274 |
||
| 907 |
_a.b11785925 _bmnait _cu |
||
| 902 | _a240330 | ||
| 998 |
_b0 _c000421 _dm _ea _fu _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 945 | _lmnait | ||
| 942 | _c22 | ||
| 942 | _c40 | ||
| 942 | _c20 | ||
| 909 |
_aBarcode : 30050120814628 _bCREATED : 2014-03-31 _cRECORD # : i12782439 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050160099502 _bCREATED : 2016-04-27 _cRECORD # : i12958852 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050121008402 _bCREATED : 2021-06-02 _cRECORD # : i13322035 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c12043 _d12043 |
||