| 000 | 04817nam a2200445 a 4500 | ||
|---|---|---|---|
| 005 | 20260819084808.0 | ||
| 008 | |||
| 035 | _a.b10734703 | ||
| 041 | 0 | _aEn | |
| 099 | _aAIT RSPR no. HS- 86-13 | ||
| 100 | _aMushtaq, Shakeeb | ||
| 245 | 0 |
_aTowards an industrial satellite for Lahore Metropolitan Area : _ba development plan for Muridke Town |
|
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1986 |
||
| 300 | _a138 p | ||
| 490 |
_aResearch studies project report ; _vno. HS-86-13 |
||
| 500 | _aA research study submitted in partial fulfillment of the requirements for the degree of Master of Science | ||
| 502 | _aResearch Studies Project Report (M. Sc.) - Asian Institute of Technology, 1986 | ||
| 520 | _aThe establishment of industries outside the major urban centres as a result of decentralization policy implemented by the Government of Pakistan in the early 1970's is a major concern of the physical planners these days. The objective of the government to achieve population decentralization through industrial industrialization has not been achieved as most of the industries do not provide housing facility to their workers so most of the workers are bound to commute daily to their workplaces. Like other urban centres, Lahore, the second largest metropolitan city in Pakistan is facing the same problem where mass commuting of industrial workers is taking place from central parts to the industrial estate established near Kala Shah Kaku along the National Highway. A study on the feasibility of resettlement of industrial workers was conducted by John (1983) which showed that almost fifty percent of the workers numbering to 7,600 are willing to resettle in the Lahore-Muridke Industrial Corridor near their workplace preferably in Muridke. The study recommended that a plan for the development of Muridke Town should be prepared and phased resettlement of the workers to the town by developing area development schemes should be carried out. Basing on the above recommendation, this study focuses on the preparation of resettlement scheme with an overall framework of an outline development plan. Information on the existing condition of town was gathered from different sources. A broad outline development plan for the town with a planning horizon of 15 years was prepared. The area requirement for various uses in terms of both locational and allocational standards was determined for the estimated target population of 176,000 by the year 2001, which included the natural increase in the existing population and the prospective resettling industrial workers from Lahore. The resettlement of the workers has been ?reposed to take place in three phases. They will be accommodated in the sites and services projects proposed in the plan. Various plot sizes ranging from 72 sq. m. to 420 sq . m. have been provided for different income groups. Affordability analysis for low-income plots have been carried out which show that the workers and the low-income beneficiaries from the town can afford a house if a site with infrastructure is provided by a development agency on controlled rates and a loan for building a house on easy installment is also made available to them. The development outlays for the project also indicate that the whole project can be self- financed with nominal seed capital requirements from the provincial and central governments. | ||
| 650 | 1 | 0 |
_aCity planning _xPakistan _xLahore |
| 700 | 1 |
_aKammeier, Hans Detlef, _eChairperson |
|
| 700 | 1 |
_aArcher, Raymon W., _eExamination Committee |
|
| 700 | 1 |
_aYapa, Lakshman S., _eExamination Committee |
|
| 710 | 2 |
_aLahore, Pakist an Canadian International Development Agency Broad Based Development Program (CIDA-BBDP), _eScholarship Donor |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B19530 |
||
| 907 |
_a.b10734703 _bmnait _c- |
||
| 902 | _a260107 | ||
| 998 |
_b2 _c951012 _dm _ea _f- _g0 |
||
| 940 |
_aAIT RSPR no. HS- 86-13 _lmnait _vb _wm _z099 |
||
| 945 |
_i30050000268325 _lmnait |
||
| 945 |
_i30050000268333 _g2 _lmnait |
||
| 945 | _lmnait | ||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c20 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050003126496 _bCREATED : 1995-10-16 _cRECORD # : i10942609 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050003126488 _bCREATED : 1995-10-16 _cRECORD # : i10942610 _dLPATRON : 1015265 _eLCHKIN : 2004-03-31 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 1 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050160114830 _bCREATED : 2016-07-04 _cRECORD # : i12926929 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c121584 _d121584 |
||