000 04889nas a2200457 a 4500
005 20260817161512.0
008 191008s2018 th au 000 a eng d
035 _a.b12309321
099 9 _aAIT Thesis no.UE-18-08
100 0 _aDechatorn Wongpaisanlak
245 1 0 _aAdaptation of hydrological and anthropogenic risks in peri-urban region :
_bcase study of flooding in Pathum Thani Province, Thailand
260 _aPathum Thani, Thailand :
_bAsian Institute of Technology,
_c2018
300 _a154 leaves :
_bill. +
_e1 online resource
490 1 _aThesis ;
_vno. UE-18-08
500 _aA thesis in partial fulfillment of the requirements for the degree of Master of science in Urban Environmental Management
502 _aThesis (M. Sc.) - Asian Institute of Technology, 2018
520 _aNorthern Bangkok peri-urban area, especially in Pathum Thani province has faced hydrological and anthropogenic risks, especially flooding. Under high rate of urbanization and population growth, exposure and vulnerability to flood risks increase rapidly. Adaptive capacity to risks is the important aspect which all relevant organization related to flooding problem as well as private sectors and households have to concern. Therefore, this research aims to enhance the adaptive capacity to hydrological risks in peri-urban context of northern Bangkok Metropolitan Region by understanding hydrological risks under climate change, assessing vulnerability to hydrological hazards among urbanization, and providing recommendations for adaptation measures. Pathum Thni province was the representative of the region which is the case study of the research. Climate change and urbanization related hydrological risk is the scope of the research. To grab the whole view of the studied system, DPSIR was a proper framework used in this research. It used to analyze the whole situation of the province. Interview of authorities was done for understand the current situation in depth. Questionnaire survey of 500 people in 2 focused Study Area which categorized by dominant land use were done to assess vulnerability (sensitivity and adaptive capacity) of the system. Focused group meeting was taken place to find out key issues and key adaptations in the future by relevant stakeholders. PT A and OTA are the main method for summarized and analyzed the information. F rom the study, it is obvious that sensitivity of drainage system is the key issues of flooding problems in focused area. More over the problem of W & WW clogging in the pipe of the system also decreased the capacity of the drainage system. While the problem that households along the river did not have the effective strategies to deal with flooding came from lack of knowledge providing to the communities. And increasing of the severity of hazard also came from lack of river dredging. Current adaptive capacity in municipalities of study areas are still lack of long term adaptation capacity in both planned and autonomous measures. Lack of integrated dimension and level of governance was the key factor that caused the operation and management cannot practice effectively. In the other hand, lack of knowledge and awareness raising, and lack of community CSR activities related with flooding are the key issues among households.
650 0 _aFloods
_xRisk assessment
_zThailand
_zPathumthani
650 0 _aUrbanization
_zThailand
_zPathumthani
_vCase studies
650 0 _aClimatic changes
_xRisk assessment
_zThailand
_z Pathumthani
700 0 _aVilas Nitivattananon,
_eChairperson
700 1 _aKim, Sohee Minsun,
_eExamination Committee
700 0 _aSarawut Ninsawat,
_eExamination Committee
710 2 _aRoyal Thai Government Fellowship,
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. UE-18-08
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B18499
907 _a.b12309321
_bmnait
_cm
902 _a240618
998 _b0
_c191008
_dm
_ea
_fm
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
945 _lmnarc
942 _c40
942 _c20
909 _aBarcode : 30050120895320
_bCREATED : 2019-05-16
_cRECORD # : i13185937
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050120953996
_bCREATED : 2019-08-10
_cRECORD # : i13221164
_dLPATRON : 1026166
_eLCHKIN : 2020-03-16
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 1
_iTOT CHKOUT : 1
_jTOT RENEW : 1
909 _aBarcode : 30050120953962
_bCREATED : 2019-08-10
_cRECORD # : i13221176
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050211031058
_bCREATED : 2021-11-22
_cRECORD # : i13355272
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c1534
_d1534