100 0 _aSuparat Wongnen
245 1 3 _aAn adaptive particle swarm optimization algorithm for multiobjective job shop scheduling problems
260 _aPathum Thani, Thailand :
_bAsian Institute of Technology,
_c2009
300 _a67 p. :
_bill.
490 1 _aThesis ;
_vno. ISE-09-17
500 _aSubmitted in partial fulfillment of the requirements for the degree of Master of Engineering in Industrial and Manufacturing Engineering, School of Engineering and Technology
520 _aThis research introduces an adaptive particle swarm optimization algorithm for multi objective job shop scheduling problems. The three objectives considered in this research are: minimize makespan, minimize total weighted earliness and minimize total weight tardiness. The objective is to find optimal or near optimal results with these objectives. The solution of multi objective cases will be represented in two ways as weight aggregating approach and Pareto optimization approach. The proposed algorithm uses an adaptive PSO which is approach to solve the problem. The parameter adaptation of PSO is focused on inertia weight and acceleration constants. In order to get high quality of solution the re-initialization strategy and local search and also applied in the proposed algorithm. The proposed algorithm is evaluated by using the benchmark problems provided by the OR-library and compared it with best known results from published works for both single and multi objective cases. The proposed PSO algorithm can find good solutions in both of single and multi objective cases in term of solution quality and computational time. However, the result from the proposed algorithm cannot performed better than 2ST-PSO in some cases because of the number of particles. Also, when the proposed algorithm use the same number of particles with 2ST-PSO, then the result performed better than 2ST-PSO in term of solution quality but take longer computational time.
502 _aThesis (M.Eng.) - Asian Institute of Technology, 2009
650 0 _aProduction scheduling
700 0 _aVoratas Kachitvichyanukul,
_eChairperson
700 1 _aGong, Dah-Chuan,
_eExamination committee
700 1 _aHuynh, Trung Luong,
_eExamination Committee
710 2 _aAsian Institute of Technology Fellowship,
_eScholarship donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. ISE-09-17
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B03259
907 _a.b12088456
_bmnait
_cu
902 _a240401
998 _b0
_c110110
_dm
_ea
_fu
_g3
962 _a000:001:PDF:b1208845:000361:0:0:0:0:0:0
_tAbstract-AIT Thesis no.ISE-09-17
_vn
945 _lmnait
945 _lmnarc
942 _c22
942 _c40
909 _aBarcode : 30050120700801
_bCREATED : 2014-03-20
_cRECORD # : i12774534
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050160030507
_bCREATED : 2016-03-16
_cRECORD # : i12892476
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c1621
_d1621