000 03472nam|a2200385 i 4500
005 20260818084318.0
008 020299s1986 th 0000|0 eng d
035 _a.b10152246
099 9 _aAIT Thesis no.GT-85-05
100 1 _aDemafeliz, Sheila Jay D.
245 1 0 _aComparison of priorities for programming rural tertiary roads
260 _aBangkok :
_bAsian Institute of Technology,
_c1986
300 _a72 p.
490 1 _aThesis ;
_vno. GT-85-05
500 _aA thesis submitted in partial fulfilment of the requirements for the degree of Master of Engineering School of Engineering and Technology
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1986
520 _aThe research deals with the evaluation of methods in selecting rural tertiary road projects in developing countries. The case study area is Cebu Province, Philippines. It has also included the study of Philippine 's rural roads and the setting of priorities for rural road projects particularly in the study area. Two existing methods are used in evaluating the ranking namely: the ARD--WB Method and the WSP Heuristic solution. Two different kinds of road network were presented. One for the independent sample, that is, the proposed roads are independent of each other, and the other for the dependent sample. Comparison of the different methods was done , using the independent and dependent samples. The actual ranking of the study area and the ARD--WB Method is compared using independent samples. Their relationships were tested using the Wilcoxon Test for paired observation with a level of significance equal to 0.05. Both rankings are related to the other. A new framework of setting priori ties for rural road projects is developed by combining and modifying the two existing methods. With the brief account of the study, two additional advantages are presented, as such: the computation of benefits includes the effect of the old or existing road to the new road project. Secondly, the inclusion of many benefit parameters to the ranking method. Ranking is done using the new method and comparison resulted that Modified and Combined ARD--WB-WSP Method is more related to the WSP as compared to ARD--WB Method . Two existing methods were related to the Modified and Combined ARD--WB-WSP Method. The new developed method is recommended to rural road planners in selecting mutually dependent road projects considering the advantages over the existing methods.
650 0 _aHighway research
700 1 _aMiyamoto, Kazuaki,
_eChairperson
700 1 _aMurata, Takahiro,
_eExamination Committee
700 0 _aPrapansak Buranaprapa,
_eExamination Committee
710 2 _aThe Royal Danish Government (DANIDA),
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. GT-85-05
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B19661
907 _a.b10152246
_bmnait
_cs
902 _a240411
998 _b2
_c951012
_dm
_ea
_fs
_g0
945 _lmnait
945 _lmnarc
942 _c22
942 _c40
909 _aBarcode : 30050120653927
_bCREATED : 2014-11-03
_cRECORD # : i12770498
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050160052568
_bCREATED : 2016-05-19
_cRECORD # : i12983688
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c20002
_d20002