000 03022nas a2200349 a 4500
005 20260818084319.0
008 260319s20209999th u ms tm 000 eng d
035 _a.b12491603
099 9 _aAIT Proj. no.MPM-MM-CM-20-05
100 1 _aThant Zin
245 1 0 _aComparison of project management approaches between steel box grinder using launching method and temporary support in bridge project
260 _aPathum Thani, Thailand :
_bAsian Institute of Technology,
_c2020
300 _a145 leaves :
_bill. +
_e1 online resource
490 1 _aProject ;
_vno. MPM-MM-CM-20-05
500 _aA project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management
502 _aProject (M. Eng.) - Asian Institute of Technology, 2020
520 _aNowadays, Myanmar is on the way to democracy economic system. It is the first priority to promote country{u2019}s economic development. Then, basic infrastructure like road and bridge, railways, waterway, electricity, telecommunication, water supply, financial institution, ect are needed a lot to be constructed as it can carry out the economic activities and which help in economic development of the country. Not only new infrastructure to be built but also old infrastructure have to be repaired and upgraded. For road and bridge infrastructure which is under the ministry of construction. The government has allocated sufficient budget for both new building and system upgrading to fulfill the increasing infrastructure requirement. For public infrastructure project, mostly it is implemented base on annual budget, and it has both budget and time constraint. Therefore, it is a big challenge to complete the project within budget limitation and defined period. A suitable construction method could be used during the execution of a construction project to reduce construction time and cost. This report proposes two difference construction methods like launching method and temporary support method used in the bridge project. Analysis has carried out to find out key aspect in term of project management and it can help to improve the selection of construction methods for a bridge.
650 0 _aProject management
_zMyanmar
650 0 _aBridges
_xDesign and construction
_zMyanmar
700 1 _aHadikusumo, Bonaventura H. W.,
_eChairperson
700 0 _aChotchai Charoenngam,
_eExamination Committee
700 0 _aWasan Teerajetgul,
_eExamination Committee
810 2 _aAsian Institute of Technology.
_tProject ;
_vno. MPM-MM-CM-20-05
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B23814
907 _a.b12491603
_bmnarc
_ca
902 _a260330
998 _b0
_c260330
_dm
_eh
_fa
_g0
945 _lmnarc
942 _c67
909 _aBarcode : -
_bCREATED : 2026-03-19
_cRECORD # : i13588746
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c20003
_d20003