| 000 | 03313nam a2200409 4500 | ||
|---|---|---|---|
| 005 | 20260818084400.0 | ||
| 008 | 030898 th eng | ||
| 035 | _a.b10153160 | ||
| 099 | 9 | _aAIT Thesis no. ST-85-19 | |
| 100 | 0 | _aTawat Meeprasertsagool | |
| 245 | 1 | 0 | _aCompetitiveness of various floor systems in Thailand |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1985 |
||
| 300 | _a113 p. | ||
| 490 | 1 |
_aThesis ; _vno. ST-85-19 |
|
| 500 | _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 1985 | ||
| 520 | _aA Guide to compare the competitiveness of three various floor systems used in Thailand; i.e., precast concrete slab on reinforced concrete beams, precast concrete slab on steel beams, and post-tensioned flat plates is proposed in the study. In addition, another floor system; i.e., the composite steel deck slab, which is widely used in U.S.A., is also considered to see its potential for application in Thailand. Investigation of each follr system has been made on 4 selected span lengths of 6.00, 8.00, 10.00 and 12.00m. with 3 different specified live loads of 200, 300 and 400 kg/m2, respectively, with additional constant supperimposede dead load of 100 kg/m2 for each live load case. Consideration of cost, weight, required depth, construction time and process has been accounted for. From this study, various comparison about cost per unit area, weight per unit area, required depth, and construction time of each floor system can be made. Varying live load cases are proved to have no effect on the comparative trends of cost, weight, and depth between each system with the same length. Only varying span lengths have effects on such trends, which are presented in detalis herein. The construction time required for 3 floor systems; i.e. the precast concrete slab with steel beams, the post-tensioned float plate, and the composite steel deck slab, is 6 day, whereas that for the precast concrete slab with reinforced concrete beam is 9 days. | ||
| 650 | 0 | _aFloors | |
| 700 | 1 |
_aKarasudhi, Pisidhi, _eChairperson |
|
| 700 | 0 |
_aPichai Nimityongskul, _eCo-Chairperson |
|
| 700 | 1 |
_aPama, Ricardo P., _eExamination Committee |
|
| 710 | 2 | _aGerman Academic Exchange Service (DAAD), Scholarship Donor | |
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. ST-85-19 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B20113 |
||
| 907 |
_a.b10153160 _bmnait _cs |
||
| 902 | _a240411 | ||
| 998 |
_b2 _c951012 _dm _ea _fs _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c20 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050003061875 _bCREATED : 1995-10-13 _cRECORD # : i1018059x _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050003061867 _bCREATED : 1995-10-13 _cRECORD # : i10180606 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050160012547 _bCREATED : 2016-05-04 _cRECORD # : i12925822 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c20240 _d20240 |
||