000 03488nam a2200433 4500
005 20260818084818.0
008 150698 th eng
035 _a.b10164996
099 9 _aAIT Thesis no. WA-91-5
100 1 _aChoudhari, Lakshmi Narayan
245 1 0 _aConjunctive operation of diversion canal and reservoir in the Banganga Irrigation Project, Nepal
260 _aBangkok :
_bAsian Institute of Technology,
_c1991
300 _a99 p.
490 1 _aThesis ;
_vno. WA-91-5
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1991
520 _aThe operation of the Jagdishpur reservoir and the main canal of the Banganga Irrigation Project in Nepal has been practised so far in an ad-hoc basis and as a result there is a recurrent shortage of water especially at the tail end portion of the command area. A Simulation model has been developed with deterministic crop water demand and stochastic inflow for the conjunctive operation of the diversion canal and the reservoir system. Synthetic flows for 50 years have been generated from the available short historical inflow records to find the decadewise release policy and the reliability of the system. Out of several alternatives tested in the simulation runs by varying the main canal capacity (off-taking from reservoir) and the reservoir capacity, the optimal set of alternatives have been identified by using compromise programming. From the simulation results, we find that the reliability is lower when the command area is high and vice-versa as expected. The model developed has been used for the case study of the above mentioned irrigation project in Western Nepal. The standard operating rule developed and the non-dominated set of alternatives if applied to this project would help in improving the reliability and the performance of the system. From the study, it is found that the existing reservoir capacity is 50% lower and the main canal capacity is 10% lower than required for acceptable irrigation reliability.
650 0 _aWater resources development
_xNepal
650 0 _aBanganga Irrigation Project
700 1 _aHarboe, Ricardo,
_echairperson
700 1 _aPaudyal, Guna Nidhi,
_eExamination Committee
700 1 _aMurty, V.V.N.,
_eExamination Committee
700 1 _aLoof, Rainer,
_eExamination Committee
710 2 _aGovernment of Switzerland,
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. WA-91-5
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B17741
907 _a.b10164996
_bmnait
_cs
902 _a240411
998 _b2
_c951012
_dm
_ea
_fs
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050003054599
_bCREATED : 1994-05-16
_cRECORD # : i10195713
_dLPATRON : 1019781
_eLCHKIN : 2007-02-27
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 1
_jTOT RENEW : 0
909 _aBarcode : 30050120574974
_bCREATED : 1994-05-16
_cRECORD # : i10195725
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 3
_jTOT RENEW : 0
909 _aBarcode : 30050160033568
_bCREATED : 2016-02-15
_cRECORD # : i12881909
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c22012
_d22012