000 02951nas a2200349 a 4500
005 20260818084937.0
008 260324s20219999th u ms tm 000 eng d
035 _a.b12493065
099 9 _aAIT Proj. no.MPM-MM-CM-21-22
100 1 _aNyi Nyi Win Htut
245 1 0 _aConsultants' project management system to manage contractors :
_ba case study of a factory project
260 _aPathum Thani, Thailand :
_bAsian Institute of Technology,
_c2021
300 _a100 leaves :
_bill. +
_e1 online resource
490 1 _aProject ;
_vno. MPM-MM-CM-21-22
500 _aA project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management
502 _aProject (M. Eng.) - Asian Institute of Technology, 2021
520 _aA project is a combination of complex activities under the definite starting point and end point. It unites with many organization of owner, designer, consultant and contractor depend on bidding type. Project management manages to achieve the objectives and satisfaction of the client by providing service to manage the cost, quality and time with the approved design and specification adding with the safety and environmental aspects. Thus, consultant{u2019}s project management system is a vital role of the construction phase. This report is shown for the practice of consultant project management with the case study. It is shown how consultant team manage to contractor in each item of design management during construction phase, schedule, cost, quality and health, safety and environmental in startup, during and end of construction. From the practice, this report analyzes the strengths, weakness and recommendation in each management. From the analysis, a framework develops by adding the existing system to be more efficient for consultant{u2019}s project management. Nowadays, it had seen many accidents or failures in constructions especially in developing countries under lack of supervision, quality and design. This report might help some parts to develop or share knowledge the project management in construction.
650 0 _aProject management
_zMyanmar
_vCase studies
650 0 _aConstruction projects
_zMyanmar
_vCase studies
700 1 _aHadikusumo, Bonaventura H. W.,
_eChairperson
700 0 _aChotchai Charoenngam,
_eExamination Committee
700 0 _aWasan Teerajetgul,
_eExamination Committee
810 2 _aAsian Institute of Technology.
_tProject ;
_vno. MPM-MM-CM-21-22
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B23858
907 _a.b12493065
_bmnarc
_ca
902 _a260401
998 _b0
_c260331
_dm
_eh
_fa
_g0
945 _lmnarc
942 _c67
909 _aBarcode : -
_bCREATED : 2026-03-24
_cRECORD # : i13590297
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c22521
_d22521