| 000 | 03211nas a2200385 a 4500 | ||
|---|---|---|---|
| 005 | 20260818085019.0 | ||
| 008 | 090120s2008 th uu|m rtt 0| a1eng d | ||
| 035 | _a.b12045470 | ||
| 099 | 9 | _aAIT Thesis no.ET-08-15 | |
| 100 | 0 | _aSean Piseth | |
| 245 | 1 | 0 |
_aContingency analysis : _ba case study of electric power transmission system in Phnom Penh, Cambodia |
| 260 |
_aPathum Thani, Thailand : _bAsian Institute of Technology, _c2008 |
||
| 300 |
_a1 online resource (72 leaves) : _bill. |
||
| 490 | 1 |
_aThesis ; _vno. ET-08-15 |
|
| 500 | _aA thesis submitted in partial fulfillment of the requirements for the degree of Mater of Engineering | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 2008 | ||
| 520 | _aThe successful service to supply electric power is to provide sufficient amount of energy consumption to customers with reliable, security, quality in an economic manner. Contingency analysis is one of the functions in Energy Management System which is in Control Center; this application can be utilized in order to predict what will occur in electric power system followed by the outage of equipment which helps operators to take any actions in advance to maintain the system in the safe condition. Contingency Analysis is very significant application for operation and monitoring of electric power system. This thesis is mainly conducted to contingency analysis by using Artificial Neural Network Approach for IEEE 14 bus system and the existing Phnom Penh electric power transmission system, Cambodia in order to improve system reliability, power quality and security of supply. In this study, it is only focused on power transfer capability in the transmission lines and voltage violation in each bus of the existing system during contingency in this system. The comparison of proposed ANN method, DC Power Flow and AC Power Flow (Newton Raphosn) is made. As a result Artificial Neural obtained the similar results in a fast computation. Finally, the recommendation to reinforce GS3 to CEP line to double circuit line for the existing electric power transmission system to improve the system performance during contingency is also provided | ||
| 650 | 0 |
_aElectric power transmission _zCambodia _zPhnom Penh |
|
| 700 | 0 |
_aWeerakorn Ongsakul, _eChairperson |
|
| 700 | 1 |
_aNadarajah, Mithulananthan, _eExamination Committee |
|
| 700 | 1 |
_aWang, Yaw-Juen, _eExamination Committee |
|
| 710 | 2 |
_aFrance-AIT Fellowship, _eScholarship Donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. ET-08-15 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B02184 |
||
| 907 |
_a.b12045470 _bmnait _cu |
||
| 902 | _a240401 | ||
| 998 |
_b0 _c090120 _dm _ea _fu _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c22 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120384572 _bCREATED : 2014-04-02 _cRECORD # : i12755205 _dLPATRON : 1027419 _eLCHKIN : 2017-01-30 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 1 _iTOT CHKOUT : 1 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050120368880 _bCREATED : 2016-08-06 _cRECORD # : i13022209 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c22787 _d22787 |
||