000 04105nas|a2200445 a 4500
005 20260818085147.0
008 070823s2004 th uu|m rtt 0| a1eng d
035 _a.b12020163
099 9 _aAIT Diss. no.ET-04-02
100 0 _aKeerati Chayakulkheeree
245 1 0 _aCoordinated fuzzy constrained optimal power dispatch bilateral, balancing electricity and ancillary services markets
260 _aPathum Thani, Thailand :
_bAsian Institute of Technology,
_c2004
300 _a106 p. :
_bill.
490 1 _aDissertation ;
_vno. ET-04-02
500 _aA dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Engineering, School of Environment, Resources and Development
502 _aThesis (Ph.D.) - Asian Institute of Technology, 2004
520 _aThis dissertation proposes a coordinated fuzzy constrained optimal power dispatch (CFCOPD) algorithm for bilateral contract, balancing electricity and ancillary services markets. The CFCOPD problem is decomposed into social welfare fuzzy maximization subproblem which is solved by the mixed-integer fuzzy linear programming (MIFLP) and combined reactive power cost and cost of real power loss fuzzy minimization subproblem which is solved by the fuzzy linear programming (FLP). In the social welfare maximization subproblem, the framework includes three separate markets which are bilateral contract market (BCM), balancing market (BM), and ancillary services market (ASM). The proposed CFCOPD algorithm maximizes the overall social welfare in three markets simultaneously satisfying power balance, ancillary services requirements and line flow constraints. The line flow limit and transformer loading constraints and ancillary services requirements are treated by the fuzzy constraints. In the combined reactive power cost and cost of real power loss fuzzy minimization subproblem, the reactive power prices and quantities are offered by the ancillary services providers. The bus voltage magnitudes are also treated by the fuzzy constraints. The proposed CFCOPD algorithm is tested oil the modified IEEE 30 bus system and the Thai power 424 bus system. Tile dispatch results show that the social welfare of the fuzzy constrained competitive electricity and ancillary services price (CEASP) scheme with bilateral contract curtailment bids is higher than those of competitive electricity price (CEP) scheme, and CEASP scheme with and without bilateral contract curtailment bids, leading to a lower average electricity price. In addition, with the spot price including the marginal electricity price and marginal ancillary services prices, the sharper price signal could be sent to all market participants.
650 0 _aElectric power systems
_xLoad dispatching
650 0 _aElectricity
_xMarketing
700 0 _aWeerakorn Ongsakul,
_eChairperson
700 0 _aSurapong Chiraratananon,
_eExamination Committee
700 1 _aBatanov, Dentcho N.,
_eExamination Committee
700 1 _aNadarajah, Mithulananthan,
_eExamination Committee
700 1 _aKhaparde, S.A.,
_eExamination committee
710 2 _aRoyal Thai Government (RTG),
_eScholarship donor
810 2 _aAsian Institute of Technology.
_tDissertation ;
_vno. ET-04-02
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B08441
907 _a.b12020163
_bmnait
_cu
902 _a240401
998 _b0
_c070823
_dm
_ea
_fu
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050120557235
_bCREATED : 2007-08-23
_cRECORD # : i12536970
_dLPATRON : 1019019
_eLCHKIN : 2010-09-17
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 1
_jTOT RENEW : 0
909 _aBarcode : 30050120557243
_bCREATED : 2007-08-23
_cRECORD # : i12536982
_dLPATRON : 1019019
_eLCHKIN : 2008-05-03
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 1
_jTOT RENEW : 0
909 _aBarcode : 30050160036934
_bCREATED : 2016-01-26
_cRECORD # : i12874346
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c23362
_d23362