000 04489cas|a2200433 i 4500
005 20260818085258.0
008 160399s1990 th uzm rtt 00| a1eng d
035 _a.b10173754
099 9 _aAIT Thesis no.EV-90-25
100 1 _aWang, Wen Han
245 1 0 _aCost analysis of industrial wastewater treatment in Taiwan, Republic of China
260 _aBangkok :
_bAsian Institute of Technology,
_c1990
300 _a139 p.
490 1 _aThesis ;
_vno. EV-90-25
500 _a A thesis submitted in partial fulfilment of the requirements for the degree of Master of Engineering, School of Environment, Resources and Development
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1990
520 _aThe purpose o f this study were to collect., categorize , and analyze construction bid data and operation / maintenance cost data for waste water treatment plants nation wide with goal of providing a reference. for estimating future facility costs. To accomplish this, construction bid information was obtained from association . All facilities sampled are industrial wastewater treatment plant funded after 1973 . The 35 treatment plants construction projects were sampled , and only 25 of them were available of sufficient data for analyzing . During data analysis, it was assumed the cost of treatment plant could be viewed from three perspectives : the cost of entire plants, the sum of the cost of the individual construction unit process and the s um o f the cost of individual construction components such as steel , concrete,. .. etc. Therefore, construction cost data were categorized according to three levels of detail. Using linear regression analysist technique cost curves developed relating item cost to plant design flow for each of data . Method of estimating wastewater treatment plant based on first quarter of 1989 new Taiwan dollars using construction cost indices. In practical , several cases in sufficient data were available to develop valid relation ships for specific unit processes or construction components. In other cases a equated at a were available to define cost relations hips for individual types of plants. As more construction cost history becomes avai1able , it is expected that the current data base will be expanded and up date regularly providing a more complete series of cost estimating relation ship . Due to economical fluctuation , cost functions, actualized by using the cost indices for construction , presented in this study , preferred normally comparison used to prediction used . The fitful range scale use d in this study differed from 1 25 0 m3 /d to 30000 m3 / d , that means flowrate out of this range will be some what more un certain . 'Main treatment unit processes of wastewater treatment like pumping station , screening, preliminary treatment , equalization , sedimentation , clarifier , drylined ,... etc were considered and were compared with literature, especially with EPA functions of U. S. A. Differences were found And causes are discussed . This study supplies information for the foreign investors as well as for domestic manufacturers to estimate costs for wastewater treatment in Taiwan .
650 0 _aFactory and trade waste
_xTaiwan
650 0 _aCost effectiveness
700 1 _aVerink, Johan,
_eChairperson
700 1 _aSuselo, Tri Binarko,
_eExamination Committee
700 1 _aWaibel, Hermann,
_eExamination Committee
710 2 _aBES Engineering Corporation Tai wan, Rep . of China,
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. EV-90-25
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B18378
907 _a.b10173754
_bmnait
_cx
902 _a240411
998 _b2
_c951012
_dm
_ea
_fx
_g0
945 _lmnait
945 _lmnarc
945 _lmnait
942 _c22
942 _c40
942 _c20
909 _aBarcode : 30050120124549
_bCREATED : 2014-03-28
_cRECORD # : i12781563
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050120222814
_bCREATED : 2016-11-05
_cRECORD # : i12974237
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050121001977
_bCREATED : 2020-02-11
_cRECORD # : i13306728
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c23814
_d23814