| 100 | 1 | _aMoughal, Khalid Ilyas | |
| 245 | 1 | 0 | _aCost analysis of the solid waste collection system in Lahore, Pakistan |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1993 |
||
| 300 |
_a105 leaves + _e1 online resource |
||
| 490 | 1 |
_aThesis ; _vno. EV-93-01 |
|
| 500 | _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 1993 | ||
| 520 | _aA study is carried out to analyze the cost and efficiency of existing collection and transportation system of solid waste and design a appropriate collection and transportation system of solid waste, most suitable under the prevailing condition without affecting the economy, for the city of Lahore, Pakistan. The traditional time and motion study technique was applied to study the proposed system of collection and transportation of solid waste. The city for this purpose divided into three main areas i.e., walled city, semi-developed area and developed area, different in sense that main feature of each area can be related to its town planning. The quantity of solid waste collected by the existing system is 1569.6 tons/day which is 71 % of the total waste generated. The overall cost of collection and transportation of solid waste is found to be 524 Rs/ton or 1.9 kg/Rs of waste collected. This high cost is due to the improper allocation of vehicles in different zones and town planning constraints. During field survey two basic measure of efficiency were examined, which were the average time spent on collection of waste as a measure of the efficiency of collection crew/and the total waste collected and transported per trip as an other measure of the ยท efficiency of collection vehicle. In analysis, concentration was on to examine the interaction of equipment utilization and crew efficiency of collection vehicles by varying the truck size. Truck types and crew productive times were determined the least as the cost alternatives. The results of study show that bullock cart and arm-roll truck is the most economical combination for the collection and transportation of solid waste in walled city. In semi-developed area it is economical with open top truck (capacity 8 m3) for residential area and arm-roll truck for commercial area. Similarly 8 m3 compactor and arm-roll truck combination is economical for developed area. The total cost of collection and transportation of proposed is 325 Rs/ton or 3.1 kg/Rs of waste collected, which in comparison to existing system is found to be 38 % more efficient. | ||
| 650 | 0 |
_aRefuse and refuse disposal _xPakistan _xLahore |
|
| 650 | 0 |
_aRefuse and refuse disposal _xCosts |
|
| 700 | 1 |
_aLee, Seong-Key, _eChairperson |
|
| 700 | 1 |
_aSchroder, Hans, _eExamination committee |
|
| 700 | 1 |
_aFujii, Shigeo, _eExamination committee |
|
| 710 | 2 |
_aGovernment of Germany, _eScholarship donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. EV-93-01 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B16199 |
||
| 907 |
_a.b10173808 _bmnait _cx |
||
| 902 | _a240411 | ||
| 998 |
_b2 _c951012 _dm _ea _fx _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c20 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050003046983 _bCREATED : 1994-05-16 _cRECORD # : i10206504 _dLPATRON : 1017691 _eLCHKIN : 2005-04-30 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 3 _jTOT RENEW : 1 |
||
| 909 |
_aBarcode : 30050003046991 _bCREATED : 1994-05-16 _cRECORD # : i10206516 _dLPATRON : 1016132 _eLCHKIN : 2003-07-19 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 8 _jTOT RENEW : 2 |
||
| 909 |
_aBarcode : 30050160055959 _bCREATED : 2016-11-05 _cRECORD # : i12974936 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c23821 _d23821 |
||