| 000 | 03091nas|a2200409 i 4500 | ||
|---|---|---|---|
| 005 | 20260818090006.0 | ||
| 008 | 121095s1982 th uu mrttt 00| a1eng d | ||
| 035 | _a.b10186372 | ||
| 099 | 9 | _aAIT SSPR no. IE-82-12 | |
| 100 | 0 | _aChaichana Sangjan | |
| 245 | 1 | 0 | _aDemand forecasting and production scheduling in a small tractor assembly plant |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1982 |
||
| 300 | _a105, A-3, B-9, C-9 p. | ||
| 490 | 1 |
_aSpecial Studies Project Report ; _vno. IE-82-12 |
|
| 500 | _aA special study submitted in partial fulfillment of the requirement for the degree of Master of Engineering, School of Engineering and Technology | ||
| 502 | _aSpecial Studies Project Report (M. Eng.) - Asian Institute of Technology, 1982 | ||
| 520 | _aLocal small tractor industry in Thailand has been growing rapidly for a long time but due to heavy competition in the market, which is a price sensitive market, and lack of technology knowledgement, it recently began to suffer and several firms had to leave the industry. To be able to survive in the market, a firm has to reduce the price of its product as much as possible or, otherwise, be capable of introducing a new model to the market. However, most of the firms in the industry are developed from small repairing shops and do not have enough technology knowledgement to improve the production process and reduce the production costs or design a new model to the market. The study has picked up a relatively large firm in the industry as a case study and is aimed at reducing the production costs of the firm by forecasting the demand and making production plans and schedules. The demand forecasting is done by applying regression analysis to the proposed model with an assistance of the SPSS package. Production planning and scheduling system proposed is a time constraint and production smoothing one. A FORTRAN IV scheduling program is written to help in routine computations and making the production plans and schedules. | ||
| 650 | 0 |
_aTractor _xIndustry |
|
| 650 | 0 | _aScheduling (Management) | |
| 700 | 1 |
_aTabucanon, Mario T., _eChairperson |
|
| 700 | 1 |
_aMerkies, A.H.Q.M., _eCo-Chairpeson |
|
| 700 | 0 |
_aSingha Chiamsiri, _eExamination Committee |
|
| 700 | 1 |
_aShanker, Kripa, _eExamination Committee |
|
| 710 | 2 |
_aGovernment of France, _eScholarship Donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tSpecial studies project report ; _vno. IE-82-12 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B21107 |
||
| 907 |
_a.b10186372 _bmnait _cy |
||
| 902 | _a240815 | ||
| 998 |
_b2 _c951012 _dm _ea _fy _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c22 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120567994 _bCREATED : 2013-10-06 _cRECORD # : i12730749 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050120346449 _bCREATED : 2016-06-17 _cRECORD # : i13043456 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c26468 _d26468 |
||