| 000 | 03327nas|a2200421 i 4500 | ||
|---|---|---|---|
| 005 | 20260818090149.0 | ||
| 008 | 211099s1999 th uu m rtt 00| a1eng d | ||
| 035 | _a.b1176434x | ||
| 099 | 9 | _aAIT Thesis no.ST-99-55 | |
| 100 | 0 | _aPrakasit Naksomvongkul | |
| 245 | 1 | 0 | _aDesign cost analyzer program for Windows95 |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1999 |
||
| 300 |
_a79 leaves : _bill. |
||
| 490 | 1 |
_aThesis ; _vno. ST-99-55 |
|
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 1999 | ||
| 500 | _aA thesis submitted in partial fulfillment of the requirement for the degree of Master of Engineering, School of Civil Engineering | ||
| 520 | _aACCEST (ACCuracy in ESTimating) is a program used to analyze accuracy of design cost estimates by using contractors' bids as criteria for assessment. The program was developed by Ogunlana (1989) and was used for road projects in the United Kingdom. ACCEST95, the second version of ACCEST, was developed by Yeo (1995) for the purpose of analysing design cost estimates in civil and building projects in Thailand and Singapore. WinACCEST, the third version, was developed by Phongsupatsamit (1997) to use in Windows3. l l environment with the aim to enhance the user-friendliness of the previous programs. However, Windows3. l 1 is fading out and WinACCEST has some deficiencies in its usage, data recording and retrieving and so on. Therefore, a Windows95 version of the program named WinACCEST99 was created with Visual Basics and Help Workshop by using the same concept as in ACCEST. New features such as detailed elements analysis, learning facility, the new system to record and retrieve data were incorporated into the program. Estimating data from three projects were employed to evaluate the calculation, the steps involved in using, the system to record and retrieve data of the program. From the results, the calculations produced by WinACCEST99 and WinACCEST were exactly the same. It means that WinACCEST99 and WinACCEST are based on identical concepts for calculating the accuracy of design cost estimates. | ||
| 650 | 0 | _aWindows (Computer programs) | |
| 700 | 1 |
_aOgunlana, Stephen O., _eChairperson |
|
| 700 | 0 |
_aChotchai Charoenngam, _eExamination Committee |
|
| 700 | 1 |
_aGuey, Lin Der, _eExamination committee |
|
| 710 | 2 |
_aPartial Asian Institute of Technology, _eScholarship donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. ST-99-55 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B13152 |
||
| 907 |
_a.b1176434x _bmnait _cy |
||
| 902 | _a240419 | ||
| 998 |
_b0 _c991021 _dm _ea _fy _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c20 | ||
| 942 | _c22 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120987507 _bCREATED : 1999-10-21 _cRECORD # : i12157739 _dLPATRON : 1013389 _eLCHKIN : 2001-03-20 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 5 _jTOT RENEW : 1 |
||
| 909 |
_aBarcode : 30050120709711 _bCREATED : 2014-02-04 _cRECORD # : i12785908 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050160102512 _bCREATED : 2016-04-21 _cRECORD # : i12943113 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c27084 _d27084 |
||