| 000 | 03252nam a2200409 4500 | ||
|---|---|---|---|
| 005 | 20260818090351.0 | ||
| 008 | 310798 th eng | ||
| 035 | _a.b10027956 | ||
| 099 | 9 | _aAIT Thesis no. ST-85-03 | |
| 100 | 1 | _aBalakumar, Maheswaran | |
| 245 | 1 | 2 | _aA detailed study of the design and construction of the new Memorial Bridge in Bangkok |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1985 |
||
| 300 | _a148 p. | ||
| 490 | 1 |
_aThesis ; _vno. ST-85-03 |
|
| 500 | _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 1985 | ||
| 520 | _aA rational study of the design and the as-built construction of the New Memorial bridge in Bangkok is presented. A detailed study of the design of the prestressed concrete box girder superstructure of the bridge system is carried out considering the balanced cantilever method of construction. The usual beam theory is used for the preliminary analysis and design of the longitudinal flexural and shear stresses. A rigorous finite element method using shell elements is applied for the final detailed analysis. The design includes specifying the dimensions of the cross-section before the analysis. The bridge system was built by two different construction methods, the main bridge was built by the balanced cantilever method, using cast-in-place segments whereas the approach viaducts were built by the conventional method, where the formwork is supported on the hardened ground. A detailed study of the balanced cantilever method using cast-in-place segments and the as-built construction steps of the main bridge is carried out. This method is advantageous and competitive when long spans over unusual topography, with large and heavy segments are encountered. It avoids the interference with traffic during construction. Finally the design and construction details are discussed and conclusions are made. | ||
| 650 | 0 |
_aBridges, Cantilever _xDesign and construction |
|
| 700 | 1 |
_aKarasudhi, Pisidhi, _eChairperson |
|
| 700 | 1 |
_aWireland, Martin, _eExamination Committee |
|
| 700 | 1 |
_aCarmichael, D.G., _eExamination Committee |
|
| 710 | 2 |
_aDANIDA, Denmark, _eScholarship Donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. ST-85-03 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B20093 |
||
| 907 |
_a.b10027956 _bmnait _cs |
||
| 902 | _a240409 | ||
| 998 |
_b2 _c951012 _dm _ea _fs _g2 |
||
| 945 | _lmnait | ||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c20 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050003061552 _bCREATED : 1995-10-13 _cRECORD # : i10010440 _dLPATRON : 1027193 _eLCHKIN : 2016-04-10 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 2 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050120689194 _bCREATED : 1995-10-13 _cRECORD # : i10010452 _dLPATRON : 1015671 _eLCHKIN : 2004-05-08 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 4 _jTOT RENEW : 1 |
||
| 909 |
_aBarcode : 30050160012703 _bCREATED : 2016-05-04 _cRECORD # : i12925597 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c27858 _d27858 |
||