| 000 | 03763nas|a2200421 i 4500 | ||
|---|---|---|---|
| 005 | 20260818094043.0 | ||
| 008 | 230399s1998 th uzm rtt 00| a1eng d | ||
| 035 | _a.b11742537 | ||
| 099 | 9 | _aAIT Thesis no. ET-98-29 | |
| 100 | 0 | _aPrey Sophea | |
| 245 | 1 | 0 | _aDistribution system planning of Sihanoukville, Cambodia |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1998 |
||
| 300 | _a112 leaves | ||
| 490 | 1 |
_aThesis ; _vno. ET-98-29 |
|
| 500 | _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School o Environment Resources and Development | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 1998 | ||
| 520 | _aDistribution system planning is very important for electric power utilities. The objective of distribution system planning is to assure that a growth in demand for electricity can be satisfied in an optimal way by additional distribution systems, which are both technically adequate and reasonably economical. All the alternatives in distribution system planning should be evaluated carefully. Electric utilities always need to reduce the power losses and improve voltage profiles in their distribution networks and at the same time they need minimal investment costs. To reduce the power losses and improve voltage profiles, utilities can install capacitor banks or reconductoring or add more feeders to the existing networks and they can also increase distribution voltage level. In planning, the utilities have to study their distribution networks looking into all possible alternatives and compare them by technical and economical criteria. The alternative, which meets the technical, economic and environmental criteria at minimum cost, should be selected. This thesis applies two alternatives of distribution system planning. In the first alternative, the existing voltage level is unchanged except for one feeder. This alternative requires many feeders to be added to meet the technical criteria. In the second alternative, a 22 kV distribution voltage level is proposed and fewer feeders are needed. In order to reduce power losses, a capacitor bank is applied to installed at a feeder center of gravity. In network analysis, PSSU and SLOCl computer programs have been used. The results of these alternatives have been obtained and one alternative in distribution system planning is recommended. | ||
| 650 | 0 |
_aElectric power distribution _zCambodia _zSihanoukville |
|
| 700 | 1 |
_aMalik, A. S., _eChairperson |
|
| 700 | 0 |
_aSurapong Chiraratananon, _eExamination Committee |
|
| 700 | 1 |
_aPacudan, Romeo B., _eExamination Committee |
|
| 700 | 1 |
_aDhadbanjan, Thukaram, _eExamination Committee |
|
| 710 | 2 |
_aSwedish International Development Cooperation Agency (Sida EPSM), _eScholarship donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. ET-98-29 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B13330 |
||
| 907 |
_a.b11742537 _bmnait _cy |
||
| 902 | _a240411 | ||
| 998 |
_b0 _c990323 _dm _ea _fy _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c20 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120708028 _bCREATED : 1997-10-24 _cRECORD # : i12124606 _dLPATRON : 1021485 _eLCHKIN : 2009-02-21 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 17 _jTOT RENEW : 7 |
||
| 909 |
_aBarcode : 30050120708036 _bCREATED : 1997-10-24 _cRECORD # : i12124618 _dLPATRON : 1021485 _eLCHKIN : 2008-05-31 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 16 _jTOT RENEW : 9 |
||
| 909 |
_aBarcode : 30050120365720 _bCREATED : 2016-06-15 _cRECORD # : i13036610 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c31166 _d31166 |
||