000 03526nas|a2200397 i 4500
005 20260818094043.0
008 050126s2004 th uzm rtt 00| a1eng d
035 _a.b11952210
099 9 _aAIT Thesis no.ET-04-11
100 0 _aLe Quy Anh Tuan
245 1 0 _aDistribution system reliability improvement using distributed generators :
_ba case study of Danang Power Company (EVN)
260 _aPathum Thani, Thailand :
_bAsian Institute of Technology,
_c2004
300 _a100 leaves
490 1 _aThesis ;
_vno. ET-04-11
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Environment Resources and Development
502 _aThesis (M.Eng.) - Asian Institute of Technology, 2004
520 _aIn recent years, Distributed generation (DG) is applied in the electric power systems, it helps to save energy, economic operation and to enhance the reliability of the electric power systems, DG has a high potential to improve the distribution system performance. So Distributed generation is predicted to play an increasingly role in the electric power system in the future. Distribution system reliability is very important for electric power utilities. The objective of distribution system reliability here is to sure that a growth in demand for electricity can be satisfied in an optimal way by additional distributed generations, which are both technically adequate and reasonably economical. All the alternatives in distribution system planning should be evaluated carefully in aspects of technical as well as economical. Electric utilities always need to consider optimal ways to reduce the power losses, improve voltage quality and reliability in their distribution networks, but investment costs are also minimized. To solve the above problems, utilities can install capacitor banks or substitution of old conductors by larger cross-section conductors, or add more feeders to make loop circuits to the existing networks, or install distributed generations in some suitable places. The alternative, which meets the technical, environmental constraints with better financial criteria, should be selected. In this study, PSS-ADEPT software is used to calculate power flow of primary feeders of Danang city distribution network. Most popular reliability indices used by many utilities, LOLE, SAIFI, SAIDI, CAIDI, ASAI, ASUI , ENS and AENS are calculated for the studied network.
650 0 _aElectric power distribution
_zVietnam
650 0 _aElectric power systems
_xElectric losses
_zVietnam
700 1 _aNadarajah, Mithulananthan,
_eChairperson
700 0 _aSurapong Chiraratananon,
_eExamination Committee
700 0 _aWeerakorn Ongsakul,
_eExamination Committee
710 2 _aElectricity of Viet Nam,
_eScholarship donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. ET-04-11
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B08879
907 _a.b11952210
_bmnait
_cu
902 _a240424
998 _b0
_c050126
_dm
_ea
_fu
_g0
945 _lmnait
945 _lmnarc
942 _c22
942 _c40
909 _aBarcode : 30050120601207
_bCREATED : 2013-11-21
_cRECORD # : i12748092
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 2
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050160046719
_bCREATED : 2016-07-06
_cRECORD # : i13020377
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c31169
_d31169