000 03141nas|a2200433 i 4500
005 20260818094603.0
008 121095s1985 th uu m rtt 00| a1eng d
035 _a.b10222066
099 9 _aAIT RSPR no. IE-85-25
100 1 _aBoon, Kiew Kuan
245 1 0 _aEconomic evaluation of flexible manufacturing system
260 _aBangkok :
_bAsian Institute of Technology,
_c1985
300 _a83 p
490 _aResearch Studies Project Report ;
_vno. IE-85-25
500 _aA research study submitted in partial fulfillment of the requirements for the degree of Master of Science, School of Engineering and Technology
502 _aResearch Studies Project Report (M. Sc.) - Asian Institute of Technology, 1985
520 _aDuring the feasibility study of FMS, we have to take into the account of its technical, operational, social and economical effects. This research study is to develop a methodology for the analysis of FMS concerning the economic evaluation or cost justification, from the user's point of view. This methodology will takes into the consideration of : a) The component's capabilities b) The market demand c) Income tax and incentive tax rates d) Component's depreciation e) Cost of capital investment f) The different options in obtaining the component (buy or lease) g) Inventory level h) Inventory cost and backlog cost i) Different in quality between products j) Different in flexibility between components A package using FORTRAN 77 runs on IBM 3038 OS/VS was developed. Besides giving the different performance of each system, from the output for the scheduling , we can obtain the number of shifts a subsystem has to perform in order to achieve the production requirement that is the demand quantity. We also obtain the inventory levels of each period.
650 0 _aProduction management
_xMathematical models
650 0 _aProduction management
_xEconomic aspects
700 1 _aLu, Iuan-Yuan,
_eChairperson
700 1 _aTabucanon, Mario T.,
_eExamination Committee
700 1 _aTang, John C.S.,
_eExamination Committee
700 1 _aClarke Harry R.,
_eExamination Committee
710 2 _aLee Foundation, Singapore.,
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tResearch studies project report ;
_vno. IE-85-25
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B19903
907 _a.b10222066
_bmnait
_cy
902 _a240329
998 _b2
_c951012
_dm
_ea
_fy
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050003110847
_bCREATED : 1995-10-14
_cRECORD # : i1026890x
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050003110854
_bCREATED : 1995-10-14
_cRECORD # : i10268911
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050160109640
_bCREATED : 2016-08-04
_cRECORD # : i12932735
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c33225
_d33225